MaintainX Asset Hub logo
EnterprisePricing
Komatsu

Komatsu Bulldozer D65E-12

Need answers fast?
Explore the manual using AI.

Komatsu Bulldozer D65E-12
Komatsu Bulldozer D65E-12

The Komatsu Bulldozer D65E-12 is a robust and reliable piece of heavy machinery designed for earthmoving and construction tasks. Known for its durability and performance, this bulldozer excels in various applications, making it a preferred choice for contractors and operators alike.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Komatsu Bulldozer D65E-12

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Komatsu Bulldozer D65E-12

Komatsu Bulldozer D65E-12

Create an account to install this asset package.

Maintenance Plans for Komatsu Bulldozer Model D65E-12

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly Bulldozer Maintenance

Check mark

CHANGE OIL IN POWER TRAIN CASE, CLEAN STRAINERS (POWER TRAIN PUMP STRAINER, SCAVENGING PUMP STRAINER)

Check mark

WARNING

Check mark

The oil is at high temperature immediately after the machine has been operated. Wait for the oil to cool down before starting the operation.

Check mark

The undercover is heavy. Never try to open or close the cover when directly beneath it. When removing bolts(2), carry out the work from the rear of the cover so that you can easily get out of the way.

Check mark

Refill capacity: 48 liters (12.68 US gal)

Check mark

1. Loosen drain plug (P) (with a slit), drain the oil, then tighten drain plug (P) again.

Check mark

Do not remove drain plug (P).

Check mark

2. Remove the undercover from the rear bottom of the machine body as follows.

Check mark

1) Remove two bolts (1) from the front side of the machine body.

Run this procedureArrow right

2000 Hourly Bulldozer Maintenance

Check mark

CHANGE OIL IN HYDRAULIC TANK, REPLACE OIL FILTER ELEMENT

Check mark

WARNING

Check mark

The parts and oil are at high temperature immediately after the engine is stopped, and may cause burns. Wait for the temperature to go down before starting the work.

Check mark

When removing the oil filler cap, turn it slowly to release the internal pressure, then remove it.

Check mark

Refill capacity: 55 liters (14.53 US gal)

Check mark

1. Lower the blade to the ground securely, stop the engine and slowly turn the cap of oil filler (F) to release the internal pressure. Then, remove the cap.

Check mark

2. Remove the cover (1) at the bottom of the hydraulic tank.

Check mark

3. Loosen drain valve (2), drain the oil, tighten drain valve (2) again, then install cover (1). When loosening drain valve (2), be careful not to get oil on yourself.

Check mark

4. To drain the oil in hydraulic oil filter case (7), release the grommet under the fender and remove drain plug (3). Be careful to avoid getting oil on yourself when remove drain plug (3).

Run this procedureArrow right

250 Hourly Bulldozer Maintenance

Check mark

Lubricating

Check mark

Power TiltDozer

Check mark

Power Tilt-Power Pitch Dozer

Check mark

Angle Dozer

Check mark

Grease Equalizer Bar Side Pin

Check mark

Grease Equalizer Bar Center Pin

Check mark

Check Oil Level in Final Drive Case, Add Oil

Check mark

Check Oil Level in Hydraulic Tank, Add Oil

Check mark

Check Level of Battery Electrolyte

Run this procedureArrow right

4000 Hourly / 2 Yearly Bulldozer Replacement

Check mark

Replace Fuel hose (fuel tank - injection pump)

Check mark

Replace Fuel hose (injection pump - fuel filter)

Check mark

Replace Feul retum hose (injection pump - fuel tank)

Check mark

Replace Fuel return hose (injection nozzle - fuel tank)

Check mark

Replace Hose (power train strainer - power train pump)

Check mark

Replace Hose (power train pump - power train filter)

Check mark

Replace Hose (power train filter - transmission)

Check mark

Replace Hose (transmission case - steering relief valve)

Check mark

Replace Hose (power train lubrication pump - steering case)

Run this procedureArrow right

500 Hourly Bulldozer Maintenance

Check mark

WARNING: The engine is at high temperature immediately after the machine has been operated. Wait for the engine to cool down before replacing the filter. Do not bring fire or sparks near the fuel.

Check mark

Prepare a filter wrench and a container to catch the fuel.

Check mark

Set the container under the filter cartridge to catch the drained oil.

Check mark

Using a filter wrench, turn filter cartridge (1) counterclockwise to remove it.

Check mark

Clean the filter holder, fill the new filter cartridge with clean fuel, then coat the packing surface with oil and install to the filter holder.

Check mark

NOTICE: When filling with fuel, use clean fuel and be careful not to let any dust or dirt get in. Portion (B) at the center is the clean side, so be particularly careful not to let any dust or dirt get in. When adding fuel, always add from small hole (A) at eight places on the dirty side.

Check mark

When installing, tighten until the packing surface contacts the seal surface of the filter holder, then tighten it up 1/2 to 3/4 of a turn.

Check mark

If the filter cartridge is tightened too far, the packing will be damaged and this will lead to leakage of fuel. If the filter cartridge is too loose, fuel will also leak from the packing, so always tighten to the correct amount.

Check mark

Loosen the knob of feed pump (2) and operate it 50 to 60 times up and down. This will bleed the air.

Run this procedureArrow right

Parts for Komatsu Bulldozer D65E-12

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Air Cleaner Element Ass'Y

6125-81-7032

Air Cleaner Outer Element Ass'Y

600-181-4300

Air Conditioner Fresh Filter

14X-911-7750

Air Conditioner Recirc Filter

14X-911-7741

Blade D65E Angle Dozer (Bolt)

02090-11270

Air Cleaner Element Ass'Y

6125-81-7032

Air Cleaner Outer Element Ass'Y

600-181-4300

Air Conditioner Fresh Filter

14X-911-7750

Air Conditioner Recirc Filter

14X-911-7741

Blade D65E Angle Dozer (Bolt)

02090-11270

Air Cleaner Element Ass'Y

6125-81-7032

Air Cleaner Outer Element Ass'Y

600-181-4300

Air Conditioner Fresh Filter

14X-911-7750

Air Conditioner Recirc Filter

14X-911-7741

Blade D65E Angle Dozer (Bolt)

02090-11270

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Komatsu

Explore Other Assets