

The Komatsu Backhoe Loader WB150-2N is a versatile and robust piece of equipment designed for various construction and excavation tasks. Known for its reliability and efficiency, this backhoe loader combines powerful performance with advanced features, making it an ideal choice for contractors and operators in the industry.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Komatsu Komatsu Backhoe Loader WB150-2N WB150-2N
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
500 Hourly Backhoe Loader Maintenance
Perform these operations together with those initiated every 50 HOURS and 250 HOURS.
CHANGING ENGINE OIL
WARNING:Change the oil with machine parked on level ground and raised loader arm with the safety lock engaged.
After machine has been operated, the engine oil is very hot and may cause burns; let the engine cool down until it reaches a temperature of 40-45° C (104-113° F) before draining the oil.
Oil that may be spilled during the change makes the ground slippery, therefore, use anti-slip shoes and immediately remove any trace of oil from the floor.
Oils, filters, coolant, and the battery are considered special waste and must be collected and disposed of according to anti-pollution regulations in force.
When changing engine oil, also change the filter,(See ìCHANGING ENGINE OIL FILTERî on page 3-42).
Proceed as follows:
1. Open the engine hood.
Initial 150 Hours Backhoe Loader Maintenance
Changing Hydraulic Oil Filter
Is the machine new?
Select the type of oil used
If Synthetic Biodegradable oil is used, change the filter after the first 50 hours of operation.
For new machines using regular oil, change the filter after the first 100 and 150 hours of operation.
For successive changes, adhere to the schedule provided.
Sign off on the hydraulic oil filter change
2000 Hourly Backhoe Loader Maintenance
CHANGING HYDRAULIC SYSTEM OIL AND CLEANING SUCTION FILTER
Steps
CHANGING COOLANT
Steps
CHANGING THE BRAKING SYSTEM OIL
Steps
CHECKING ALTERNATOR AND STARTER
Alternator and Starter checked?
When Required Backhoe Loader Maintenance
CHECKING, CLEANING, OR CHANGING AIR CLEANER CARTRIDGE
WARNING:
Remove the air cleaner only after stopping engine, and do not start engine after the air cleaner is removed.
Always wear safety goggles during cleaning operations.
★ The air filtering system consists of a primary filtering element with considerable capacity and of a secondary cartridge that ensures additional safety protection.
★ The primary element can be cleaned with compressed air, while the cartridge must be replaced.
★ The filter must be cleaned when the clogging warning light (A) positioned on the side dashboard comes on or flashes.
The air cleaner can be reached after raising the loader arm, engaging the mechanical safety lock and opening the engine hood.
To clean the primary element, proceed as follows:
10 Hourly Backhoe Loader Maintenance
LUBRICATING JOINTS (GREASE FITTINGS)
WARNING:
Clean the grease fittings before attaching the grease pump.
After lubrication, remove all the contaminated grease that may have spread out of the fittings.
If the machine is used in difficult conditions, perform these operations more frequently than usual.
This maintenance operation must be done with front bucket resting on the ground, and backhoe equipment completely extended and resting on the ground, as indicated in the graphic.
Use the prescribed grease pump/grease. (See ìFUEL, COOLANT, AND LUBRICANTSî on page 3-7 and See ìLUBRICATION DIAGRAMSî on page 3-12).
★ As a general rule, it is important to consider that each cylinder is provided with two grease fittings positioned on the couplings and that each pin serving as fulcrum point for movement is provided with at least one grease fitting.
JOINT LUBRICATION POINTS
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













