

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Greenheck Centrifugal Inline Fans SQ 160
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Motor Maintenance
Safety Precautions
Disconnect, lock, and tag power source before servicing
Remove fuses and lock off disconnect to make unit non-functional
Cleaning Procedures
Clean exterior surfaces only
Remove dust buildup on motor housing
Lubrication
Is lubrication applicable for this motor?
Fastener Check
24 Hourly Fan Inspection
Inspection: SQ / BSQ
Check all internal components
BSQ Unit Specific Inspection
Inspect belt alignment
Inspect belt tension
Adjust and tighten belt as necessary
BSQ Belt And Bearing Maintenance
Belt Inspection and Replacement
Check belts for wear and tightness
Are matched belts used on units with multi-groove pulleys?
Loosen the tensioning device for belt removal
Was the belt removed by hand without forcing?
Adjust belts as shown in 'Pre-Start-Up Checks'
Bearing Maintenance
Classify shaft bearings
Are special bearings equipped for hot, humid, or dirty locations?
2000 Hourly Grease Replacement
Preliminary Checks
Are grease fittings provided on the motor?
Is the motor temperature below 104°F (40°C)?
Grease Replacement
Replace grease in motors with fittings according to manufacturer's recommendations.
Post Maintenance Verification
Was the motor running time verified to be 2000 hours?
Ensure no excess grease is left on the motor exterior.
Initial 30 Minutes Fan Inspection
Inspection: SQ / BSQ
30 Minute Interval Inspection
Inspect the following components
Adjust and tighten components as necessary
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













