MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z80'

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z80'
Genie Articulated Boom Lift Z80'

The Genie Articulated Boom Lift Z80' is a versatile aerial work platform designed for optimal reach and maneuverability. Ideal for construction and maintenance tasks, this lift combines robust performance with safety features, ensuring efficient operation in various environments. Trust Genie for reliable equipment that enhances productivity on the job site.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z80'

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z80'

Genie Articulated Boom Lift Z80'

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z80'

Integrate maintenance plans directly into your work orders in MaintainX.

50 Hourly Continental Engine Maintanance

Check mark

- Visual Inspection of engine

Check mark

- Check Oil level

Check mark

- Check Air cleaner

Check mark

- Check PCV system

Check mark

- Check Coolant level

Check mark

- Check for leaks Oil, fuel and coolant systems

Check mark

- Clean Air filter discharge valve

Check mark

- Replace Engine oil

Check mark

- Replace Oil filter

Run this procedureArrow right

2000 Hourly Boom Wear Pads Check

Check mark

- Check the Boom Wear Pads

Check mark

Maintaining the boom wear pads in good condition is essential to safe machine operation. Wear pads are placed on boom tube surfaces to provide a low friction, replaceable wear pad between moving parts. Improperly shimmed wear pads or continued use of extremely worn wear pads may result in component damage and unsafe operating conditions

Check mark

1. Measure each wear pad. Replace the wear pad once it reaches the minimum allowable thickness. If the wear pad is still within specification, shim as necessary to obtain minimum clearance with zero binding

Check mark

2. Extend and retract the boom through the entire range of motion to check for tight spots that may cause binding or scraping of the boom

Check mark

Note: Always maintain squareness between the outer and inner boom tubes

Check mark

SX-150 / SX-180;

Check mark

3. Grease the platform end bottom wear pads with a suitable lubricant

Check mark

SX-150: Grease the #1 and #2 boom tubes

Check mark

SX-180: Grease the #0 and #1 boom tubes

Run this procedureArrow right

50 Hourly Track Tension and Fastener Torque Check

Check mark

- Check the Track Tension and Fastener Torque, TRAX Models - S-40 and S-45 Models

Check mark

Maintaining proper track tension and properly torqued fasteners is essential to good machine performance and service life; The machine will not operate properly with a track that is incorrectly tensioned. Continued use of a machine with incorrectly tensioned tracks may cause component damage

Check mark

1. Thoroughly clean the track assembly of any dirt, rocks, clay, etc.

Check mark

2. Chock the tracks at one end of the machine to prevent the machine from rolling

Check mark

3. Center a lifting jack of ample capacity (20,000 Ibs / 10,000 kg) under the drive chassis between the tracks at the other end of the machine

Check mark

4. Lift the machine until the tracks are off the ground and then place jack stands under the drive chassis for support

Check mark

5. Visually inspect the section of track under the bogey wheels

Check mark

Result: There should be less than 1 inch / 2.5 cm of gap between the bogey wheels and the inside surface of the track. Proceed to step 7

Check mark

Result: There is 1 inch / 2.5 cm or more of gap between the bogey wheels and the inside surface of the track. Proceed to step 6

Run this procedureArrow right

3 Monthly Battery Inspection

Check mark

- Inspect battery

Check mark

WARNING!

Check mark

Electrocution/burn hazard

Check mark

Contact with electrically charged circuits could result in death or serious injury. Remove all rings, watches and other jewelry

Check mark

WARNING!

Check mark

Bodily injury hazard. Batteries contain acid. Avoid spilling or contacting battery acid

Check mark

Neutralize battery acid spills with baking soda and water

Check mark

Note: Fully charge the batteries and allow the batteries to rest 24 hours before performing this procedure to allow the battery cells to equalize

Check mark

1. Open the side covers

Run this procedureArrow right

3 Monthly Platform Self-Leveling Test

Check mark

- Test the Platform Self-leveling

Check mark

1. At the ground controls, lower the boom to the stowed position

Check mark

2. Activate function enable and adjust the platform to a level position

Check mark

3. Raise and lower the primary boom through a full cycle

Check mark

Result: The platform should remain level at all times to within +/-5 degrees;

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z80'

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets