MaintainX Asset Hub logo
EnterprisePricing
GEA

GEA Plate-Forming Machine CRM-600

Need answers fast?
Explore the manual using AI.

GEA Plate-Forming Machine CRM-600
GEA Plate-Forming Machine CRM-600

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for GEA Plate-Forming Machine CRM-600

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

GEA Plate-Forming Machine CRM-600

GEA Plate-Forming Machine CRM-600

Create an account to install this asset package.

Maintenance Plans for GEA Plate-Forming Machine Model CRM-600

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Multi Former Maintenance

Check mark

Warning!

Check mark

- Do not attempt to use the machine unless you have read and understood all the information in the safety chapter and you are sure of your ability to use the machine safely

Check mark

- Do not attempt to use the machine unless you know how to stop it in an emergency as described under emergency stop in the safety chapter.

Check mark

Important conditions for safe operation without problems are: - accurate, continuous inspections

Check mark

- following all safety instructions.

Check mark

Warning!:

Check mark

- Switch off and lock the main switch before cleaning.

Check mark

- Refer to chapter 1: Safety.

Check mark

- Avoid a mixture of different lubricants

Run this procedureArrow right

2000 Hourly Auger Bearings Replacement

Check mark

Warning!:

Check mark

- Do not attempt to use the machine unless you have read and understood all the information in the safety chapter and you are sure of your ability to use the machine safely

Check mark

- Do not attempt to use the machine unless you know how to stop it in an emergency as described under emergency stop in the safety chapter.

Check mark

Important conditions for safe operation without problems are: - accurate, continuous inspections

Check mark

- following all safety instructions.

Check mark

Warning!:

Check mark

- Switch off and lock the main switch before cleaning.

Check mark

1. Remove the auger. Refer to section 6.2.10 "Augers".

Check mark

2. Remove the bearing (A). Use a bearing puller.

Run this procedureArrow right

2000 Hourly Form Plate Cylinder Pressure Adjustment

Check mark

Warning: Do not attempt to use the machine unless you have read and understood all the safety information and you know how to stop it in an emergency. Switch off and lock the main switch before cleaning.

Check mark

Sealing plug of MP1 (B) loosened

Check mark

Pressure gauge connected to MP1 (B)

Check mark

Locknut of P1 (A) unscrewed

Check mark

Safety valve P1 (A) turned all the way (counterclockwise)

Check mark

Valve (E) opened all the way (counter-clockwise)

Check mark

Hydraulics button pushed. The hydraulics are now ON

Check mark

Safety valve P1 (A) turned three revolutions in (clockwise). Pressure set to 130 bar (on the pressure gauge)

Check mark

Screen 1305 (Form plate) accessed

Run this procedureArrow right

2000 Hourly Form Plate Cylinder Replacement

Check mark

Warning!:

Check mark

- Do not attempt to use the machine unless you have read and understood all the information in the safety chapter and you are sure of your ability to use the machine safely

Check mark

- Do not attempt to use the machine unless you know how to stop it in an emergency as described under emergency stop in the safety chapter.

Check mark

Important conditions for safe operation without problems are: - accurate, continuous inspections

Check mark

- following all safety instructions.

Check mark

Warning!:

Check mark

- Switch off and lock the main switch before cleaning.

Check mark

- Refer to chapter 1: Safety.

Check mark

- Avoid a mixture of different lubricants

Run this procedureArrow right

2000 Hourly Knockout Cylinder Replacement

Check mark

Warning!:

Check mark

- Do not attempt to use the machine unless you have read and understood all the information in the safety chapter and you are sure of your ability to use the machine safely

Check mark

- Do not attempt to use the machine unless you know how to stop it in an emergency as described under emergency stop in the safety chapter.

Check mark

Important conditions for safe operation without problems are: - accurate, continuous inspections

Check mark

- following all safety instructions.

Check mark

Warning!:

Check mark

- Switch off and lock the main switch before cleaning.

Check mark

- Refer to chapter 1: Safety.

Check mark

- Avoid a mixture of different lubricants

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from GEA

Explore Other Assets