

The Gardner Denver Refrigerated Dryer 9VXRD2500 is a high-performance industrial asset designed to efficiently remove moisture from compressed air systems. Known for its reliability and energy efficiency, this model ensures optimal performance and longevity in various industrial applications.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Gardner Denver Refrigerated Dryer 9VXRD2500
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Condenser Coil Cleaning
1. Air-cooled - clean off accumulated dust and dirt monthly. - A factory mounted blow gun is provided for this pur- pose.
2. Water-cooled - clean strainer monthly, more often if required.
- Shut off water, remove small plug to relieve pressure, then remove large plug to remove strainer.
- Clean strainer and replace.;
1 Yearly Oil Separator/Filter Replacement
A. When to replace the Separator/Filters
Pressure drop across dryer is excessive or it's been a year since last replacement
Pressure drop across the dryer exceeds 10 psi (0.7 bar)
B. Description of the Separator/Filter Assembly
List of Separator/Filter Assembly components
C. Replacement of the Separator/Filters
CAUTION! Depressurize the unit before servicing. Failure to do this may result in injury.
Unit is depressurized
Upper shell cap removed
1 Daily Dryer Maintenance
Check separator daily to be sure automatic drain is discharging.
NOTE: Units with two stage filtration have two sets of drains.
Blow down separator weekly by pushing test button on control panel.
Sign off on the daily dryer maintenance
Access the parts list for your equipment in MaintainX.
Fan blade (208-230/3/60)
G4140-227-30
Fan cutout switch 2 (575/3/60)
G4130-138-27
Maintenance Kits-Single Stage (208-230/3/60)
9VXRDMK11
Maintenance Kits-Single Stage (575/3/60)
9VXRDMK11
Maintenance Kits-2 stage (575/3/60)
9VXRDMK13
Fan blade (208-230/3/60)
G4140-227-30
Fan cutout switch 2 (575/3/60)
G4130-138-27
Maintenance Kits-Single Stage (208-230/3/60)
9VXRDMK11
Maintenance Kits-Single Stage (575/3/60)
9VXRDMK11
Maintenance Kits-2 stage (575/3/60)
9VXRDMK13
Fan blade (208-230/3/60)
G4140-227-30
Fan cutout switch 2 (575/3/60)
G4130-138-27
Maintenance Kits-Single Stage (208-230/3/60)
9VXRDMK11
Maintenance Kits-Single Stage (575/3/60)
9VXRDMK11
Maintenance Kits-2 stage (575/3/60)
9VXRDMK13
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













