MaintainX Logo
EnterprisePricing
Fluke

Fluke Multimeter 77

Need answers fast?
Explore the manual using AI.

Fluke Multimeter 77
Fluke Multimeter 77

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Fluke Multimeter 77

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Fluke Multimeter 77

Fluke Multimeter 77

Create an account to install this asset package.

Maintenance Plans for Fluke Multimeter Model 77

Integrate maintenance plans directly into your work orders in MaintainX.

Multimeter Check

Check mark

Display Test (70/73 Series III below s/n 80810247 only)

Check mark

To test the display, turn the UUT on and check whether all display segments come on.

Check mark

Display Test (21/23/75/77 Series III only)

Check mark

To test the display, press the range and hold buttons while turning the UUT on and check whether all display segments come on.

Check mark

DC Voltage Test

Check mark

Connect the ground/common/low side of the DC calibrator to COM on the UUT.

Check mark

1. Set the UUT function switch to VDC, and connect the DC Voltage Calibrator output to the v and COM input terminals of the UUT.

Check mark

2. Referring to Table 3, set the DC Voltage Calibrator for the output indicated in steps 1 through 5 only. Verify that the UUT display reading is within the limits shown.

Check mark

3. Set the DC Voltage Calibrator for an output of +300 mV, and switch the UUT to the 300 mV function.

Run this procedureArrow right

Multimeter Calibration

Check mark

Calibration

Check mark

Set the DC Voltage Calibrator to zero, and set the UUT to the VDC function.

Check mark

Remove the case top cover as previously described.

Check mark

Connect the DC Voltage Calibrator to the and COM input terminals of the UUT.

Check mark

Set the DC Voltage Calibrator for an output of +3.000V dc, and adjust R8 for a display reading of +3.000V dc ±.001V.

Check mark

Sign off on the multimeter calibration

Run this procedureArrow right

Multimeter Cleaning

Check mark

Warning: Do not use aromatic hydrocarbons or chlorinated solvents for cleaning.

Check mark

Do not allow the LCD to get wet. Remove the display assembly before washing the pca.

Check mark

Do not use detergent of any kind for cleaning the pca.

Check mark

Do not remove lubricants from the switch when cleaning the pca.

Check mark

Clean the instrument case with a mild detergent and water.

Check mark

The pca may be washed with isopropyl alcohol or deionized water and a soft brush.

Check mark

Remove the display assembly and fuses before washing, and avoid washing the switch if possible.

Check mark

Dry the pca with clean dry air at low pressure, then bake it at 50°C for 24 hours.

Check mark

Sign off on the multimeter cleaning

Run this procedureArrow right

1 Yearly Multimeter Check

Check mark

Performance Tests

Check mark

The performance tests are recommended as a preventive maintenance tool to verify proper instrument operation. A one year calibration cycle is recommended to maintain the specifications given. If the recommended equipment is not available, instruments with equivalent specifications may be used.

Check mark

Instrument Type

Check mark

Recommended Model

Check mark

Performance tests are recommended for incoming inspection, periodic maintenance, and for verifying the specifications. If the instrument fails any part of the test, calibration and/or repair is indicated.

Check mark

In the performance tests, the Series III Meters are referred to as the unit under test (UUT).

Check mark

Initial Procedure

Check mark

Allow the UUT to stabilize to room temperature 23°C ± 5°C (73°F ± 9°F).

Check mark

Check the fuses and battery, and replace them if necessary.

Run this procedureArrow right

Parts for Fluke Multimeter 77

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Fuse, 44/100 A (Fast Acting), 1000 Vac/Dc Min Interrupt Rating 10 Ka

943121

Fuse, 11A (Fast Acting), 1000 Vac/Dc Min Interrupt Rating 17 Ka

803293

Bottom Case Assembly (For S/N Below 1646056)

659128

Bottom Case Assembly (For S/N Above 1646056)

1646042

Case Top Assembly

659133

Fuse, 44/100 A (Fast Acting), 1000 Vac/Dc Min Interrupt Rating 10 Ka

943121

Fuse, 11A (Fast Acting), 1000 Vac/Dc Min Interrupt Rating 17 Ka

803293

Bottom Case Assembly (For S/N Below 1646056)

659128

Bottom Case Assembly (For S/N Above 1646056)

1646042

Case Top Assembly

659133

Fuse, 44/100 A (Fast Acting), 1000 Vac/Dc Min Interrupt Rating 10 Ka

943121

Fuse, 11A (Fast Acting), 1000 Vac/Dc Min Interrupt Rating 17 Ka

803293

Bottom Case Assembly (For S/N Below 1646056)

659128

Bottom Case Assembly (For S/N Above 1646056)

1646042

Case Top Assembly

659133

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Fluke

Explore Other Assets