MaintainX Asset Hub logo
EnterprisePricing
Doosan

Doosan Forklift D20S-9

Need answers fast?
Explore the manual using AI.

Doosan Forklift D20S-9
Doosan Forklift D20S-9

The Doosan Forklift D20S-9 is a robust industrial forklift designed for efficient material handling. Known for its reliability and performance, this model is ideal for various warehouse and construction applications, ensuring optimal productivity and safety in operations.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Forklift D20S-9

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Forklift D20S-9

Doosan Forklift D20S-9

Create an account to install this asset package.

Maintenance Plans for Doosan Forklift Model D20S-9

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 6 Monthly Carriage Chain Adjustment

Check mark

NOTE! Make sure that carriage height is correct.

Check mark

Is carriage height correct?

Check mark

If correct, adjust the chain for equal tension. If not, adjust the chain for correct carriage height by adjusting anchor nuts.

Check mark

NOTE! See the previous section, “Carriage Roller Extrusion” in “When Required” for proper height of carriage.

Check mark

Fully lower the carriage and tilt mast forward or lift the carriage and put blocks under the carriage to release the tension from the lift chains.

Check mark

Did you fully lower the carriage and tilt mast forward or lift the carriage and put blocks under the carriage to release the tension from the lift chains?

Check mark

Loosen nut and adjust nut to get proper distance from bottom of inner upright to the bottom of carriage bearing.

Check mark

Did you loosen nut and adjust nut to get proper distance from bottom of inner upright to the bottom of carriage bearing?

Check mark

Make adjustment anchor nut for equal chain tension.

Run this procedureArrow right

1000 Hourly / 6 Monthly Hydraulic Return Filter, Breather & Strainer Maintenance

Check mark

WARNING! Hot oil and components can cause personal injury. Do not allow hot oil or components to contact skin

Check mark

NOTE! Park the lift truck level with the forks lowered, parking brake engaged, transmission in NEUTRAL and the engine stopped

Check mark

Loosen the bolts of the hydraulic tank top plate assembly

Check mark

Remove the return filter from tank top plate assembly

Check mark

Install new return filter by hand

Check mark

Remove the suction strainer from the tank

Check mark

Install the new strainer by hand

Check mark

Install the tank top plate assembly and fasten the bolts

Check mark

Remove and discard the air breather

Run this procedureArrow right

1000 Hourly / 6 Monthly Lift Chain Equal Tension Check

Check mark

WARNING! Personal injury can be caused by sudden movement of the mast and carriage. Keep hands and feet clear of any parts that can move.

Check mark

Lift the carriage and the mast high enough for getting tension on lift chains

Check mark

Check the chains, and make sure the tension is the same

Check mark

Lift chains are required to check for equal tension about every 1,000 service hours or 6 months

Check mark

Sign off on the lift chain tension check

Run this procedureArrow right

1000 Hourly / 6 Monthly Lift Chain Wear Test

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Inspect the part of the chain that is normally operated over the cross head roller

Check mark

Inspect to be sure that chain link pins do not extend outside of the link hole

Check mark

If any single link pin is extended beyond its connecting corresponding link, it should be suspected of being broken inside of its link hole

Check mark

Lift chains are required to check for wear about every 1,000 service hours or 6 months

Check mark

Chain wear test is a measurement of wear of the chain links and pins

Check mark

Take the following steps to check chain wear

Check mark

Lift the mast and carriage enough for getting tension on lift chains

Check mark

Measure precisely ten links of chain distance at the center of pins in millimeter

Run this procedureArrow right

1000 Hourly / 6 Monthly Mast Chain Adjustment

Check mark

NOTE! Make sure that mast height is correct. If correct, adjust chain for equal tension. If not, adjust mast chain for correct mast height by adjusting anchor nuts

Check mark

NOTE! See the previous section, “Carriage Roller Extrusion” in “When Required” for proper inner mast height

Check mark

Lift the inner mast and put blocks under the inner mast to release the tension from the lift chains

Check mark

Loosen nut and adjust nut to make inner mast rail flush with outer mast rail bottom

Check mark

Make adjustment anchor nuts for equal chain tension

Check mark

Raise the inner mast and check equal chain tension. If not equal, repeat the same procedure as step 1 through step 3

Check mark

Put LOCTITE No. 242 tread lock on the threads of the anchor nuts after the adjustment is completed

Check mark

Sign off on the mast chain adjustment

Run this procedureArrow right

Parts for Doosan Forklift D20S-9

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Oil Fiter Cap

110910-00628

Oil Fiter Cap

110910-00628

Oil Fiter Cap

110910-00628

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets