Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Unit RQ71KBV4A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Compressor Removing
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Refrigerant collected
Remove the outside panels, their parts, and switch box, following the procedure Removing Outside Panels
Fixing plate for the stop valve removed
Sound insulation (1) removed
Terminal cover removed
Lead wire from the terminal (2) removed
Sound insulation pulled out by unwinding the strings (2 locations)
Nuts that fix the compressor removed
Electronic Devices Removing
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Procedure to Remove Outside Panels
Outside panels and switch box removed
Remove the pressure sensor
Connector for the pressure sensor (X17A) removed
Pressure sensor removed after cutting off the brazing (1 location)
Remove the pressure switch
Lead wire removed
Pressure switch removed after cutting off the brazing
Four Way Valve Removing
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Refrigerant collected
Remove the outside panels, their parts, and switch box, following the procedure Removing Outside Panels
Four way valve removed after removing the 1 screw
Main unit of the four way valve removed after cutting off the brazings (4 locations)
Points
Confirmed that the refrigerant is completely collected before starting the work
Other pipings protected using a protective sheet for the welding or steel plate so that the flame for the gas welding may not damage them
Main unit cooled down using a wet waste etc. so that the temperature of the main unit may not get higher than 120 °C
Outside Panels Removing
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Front panel of the side panel removed
Top panel removed
Front panel removed
Right side panel removed
Front panel of the piping cover removed
Side panel of the piping cover removed
Lower part held and pulled frontward
Suction grille removed
PCB Assy 1 Removing
Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
- Remove the top panel, the front panel, the side panel, and the piping cover, following the procedure Removing Outside Panels.
- Remove the switch box, following the procedureindicated at "Removing switch box".
1. Remove the PCB for the display (A2P)
-Remove the connectors (X205A) on the PCB for the display. - Since the PCB for the display (A2P) is fixed with 2 hooks, take from them and then remove the PCB for the display.;
Access the parts list for your equipment in MaintainX.
Coil Of Four Way Valve
X25A
Compressor Relay
X502A
Connector
X205A
Discharge Pipe Thermistor
R2T
Electronic Expansion Valve
Y1E
Coil Of Four Way Valve
X25A
Compressor Relay
X502A
Connector
X205A
Discharge Pipe Thermistor
R2T
Electronic Expansion Valve
Y1E
Coil Of Four Way Valve
X25A
Compressor Relay
X502A
Connector
X205A
Discharge Pipe Thermistor
R2T
Electronic Expansion Valve
Y1E
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX