Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin Split System Air Conditioner FNA35A2VEB
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
25000 Hourly Split System Air Conditioner Maintenance
Warning: This maintenance check requires trained personnel with PPE!
Enter the complete model name of the unit
Enter the manufacturing number (stated on the nameplate of the unit)
Enter the installation date
Enter the symptoms or malfunction, and details of the defect
Warning: Do NOT modify, disassemble, remove, reinstall or repair the unit yourself as incorrect dismantling or installation may cause an electric shock or fire. Contact your dealer.
In case of accidental refrigerant leaks, make sure there are no naked flames. The refrigerant itself is entirely safe and non-toxic. R410A is a non-combustible refrigerant, and R32 is a mildly flammable refrigerant, but they will generate a toxic gas when they accidentally leak into a room where combustible air from fan heaters, gas cookers, etc. is present.
Always have qualified service personnel confirm that the point of leakage has been repaired or corrected before resuming operation.
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
8 Yearly Drain Pan Replacement
Warning: Do NOT modify, disassemble, remove, reinstall or repair the unit yourself as incorrect dismantling or installation may cause an electric shock or fire. Contact your dealer.
In case of accidental refrigerant leaks, make sure there are no naked flames. The refrigerant itself is entirely safe and non-toxic. R410A is a non-combustible refrigerant, and R32 is a mildly flammable refrigerant, but they will generate a toxic gas when they accidentally leak into a room where combustible air from fan heaters, gas cookers, etc. is present.
Always have qualified service personnel confirm that the point of leakage has been repaired or corrected before resuming operation.
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
Replace Drain pan
Normal use without frequent starting and stopping of the unit. Depending on the model, we recommend not starting and stopping the machine more than 6 times/hour.
Operation of the unit is assumed to be 10 hours/day and 2,500 hours/year.
NOTICE
The table indicates main components. Refer to your maintenance and inspection contract for more details.
1 Yearly Split System Air Conditioner Inspection
Warning: Do NOT modify, disassemble, remove, reinstall or repair the unit yourself as incorrect dismantling or installation may cause an electric shock or fire. Contact your dealer.
In case of accidental refrigerant leaks, make sure there are no naked flames. The refrigerant itself is entirely safe and non-toxic. R410A is a non-combustible refrigerant, and R32 is a mildly flammable refrigerant, but they will generate a toxic gas when they accidentally leak into a room where combustible air from fan heaters, gas cookers, etc. is present.
Always have qualified service personnel confirm that the point of leakage has been repaired or corrected before resuming operation.
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
Normal use without frequent starting and stopping of the unit. Depending on the model, we recommend not starting and stopping the machine more than 6 times/hour.
Operation of the unit is assumed to be 10 hours/day and 2,500 hours/year.
The table indicates main components. Refer to your maintenance and inspection contract for more details.
The table indicates recommended intervals of maintenance cycles. However, in order to keep the unit operational as long as possible, maintenance work may be required sooner.
Inspect the following components
6 Monthly Air Filter Cleaning
Warning: Ensure the power is turned OFF before starting the cleaning process
TIME TO CLEAN AIR FILTER notification displayed?
If the dirt becomes impossible to clean, change the air filter
Upload a photo of the air filter before cleaning
Air filter removed successfully?
Air filter cleaned successfully?
Upload a photo of the cleaned air filter
Air filter dried successfully?
Air filter reattached successfully?
20000 Hourly Split System Air Conditioner Maintenance
Warning: Do NOT modify, disassemble, remove, reinstall or repair the unit yourself as incorrect dismantling or installation may cause an electric shock or fire. Contact your dealer.
In case of accidental refrigerant leaks, make sure there are no naked flames. The refrigerant itself is entirely safe and non-toxic. R410A is a non-combustible refrigerant, and R32 is a mildly flammable refrigerant, but they will generate a toxic gas when they accidentally leak into a room where combustible air from fan heaters, gas cookers, etc. is present.
Always have qualified service personnel confirm that the point of leakage has been repaired or corrected before resuming operation.
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
Replace Electric motor
Replace Expansion valve
Replace Solenoid valve
Normal use without frequent starting and stopping of the unit. Depending on the model, we recommend not starting and stopping the machine more than 6 times/hour.
Operation of the unit is assumed to be 10 hours/day and 2,500 hours/year.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX