Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin Split System Air Conditioner FCAG71BVEB
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
5 Yearly Heat Exchanger Maintenance
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
NOTICE: The table indicates main components. Refer to your maintenance and inspection contract for more details.
The table indicates recommended intervals of maintenance cycles. However, in order to keep the unit operational as long as possible, maintenance work may be required sooner. Recommended intervals can be used for appropriate maintenance design in terms of budgeting maintenance and inspection fees.
Depending on the content of the maintenance and inspection contract, inspection and maintenance cycles may in reality be shorter than listed.
Heat exchanger replaced?
Notes on the condition of the heat exchanger before replacement
Upload a photo of the new heat exchanger installed
Sign off on the heat exchanger maintenance
Suction Grille Cleaning
NOTICE: Do NOT use water of 50°C or higher. Possible consequence: Discoloration and deformation.
Open the suction grille
Remove the suction grille
Remove the air filter
Clean the suction grille. Wash with a soft bristle brush, and water or neutral detergent. If the suction grille is very dirty, use a typical kitchen cleaner, leave it on for 10 min, then wash it with water.
Reattach the air filter (step 3 in reverse order)
Reattach the suction grille and close it (step 2 and 1 in reverse order)
Sign off on the suction grille cleaning
25000 Hourly PCB Maintenance
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
Replace PCB
The table assumes the following conditions of use:
NOTICE
The table indicates main components. Refer to your maintenance and inspection contract for more details.
The table indicates recommended intervals of maintenance cycles. However, in order to keep the unit operational as long as possible, maintenance work may be required sooner. Recommended intervals can be used for appropriate maintenance design in terms of budgeting maintenance and inspection fees.
Depending on the content of the maintenance and inspection contract, inspection and maintenance cycles may in reality be shorter than listed.
PCB replaced?
Sign off on the PCB replacement
1 Yearly Split System Air Conditioner Inspection
Be aware that the mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
Inspect Electric motor
Inspect PCB
Inspect Heat exchanger
Inspect Sensor (thermistor, etc.)
Inspect User interface and switches
Inspect Drain pan
Inspect Expansion valve
Inspect Solenoid valve
20000 Hourly Solenoid Valve Maintenance
Warning: The mentioned maintenance and replacement cycles do not relate to the warranty period of the components.
The table assumes the following conditions of use:
NOTICE
The table indicates main components. Refer to your maintenance and inspection contract for more details.
The table indicates recommended intervals of maintenance cycles. However, in order to keep the unit operational as long as possible, maintenance work may be required sooner. Recommended intervals can be used for appropriate maintenance design in terms of budgeting maintenance and inspection fees.
Depending on the content of the maintenance and inspection contract, inspection and maintenance cycles may in reality be shorter than listed.
Solenoid valve replaced
Enter the current operational hours of the unit
Sign off on the solenoid valve maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX