

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Single Screw Chiller ZUWV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
9 Yearly Chiller Maintenance
Check at intervals as specified and replace when the component is abnormal and the replacing standard is met.
- Motor
- Injection expansion valve
- Electric expansion valve(capacity control)
- Oil Filter
- Discharge valve
- lubricant oil
- Water pressure drop
- Expansion valve
1 Monthly Chiller Inspection
Check color of compressor oil. New oil is clean and the dark brown or cloudy oil shall be replaced; the compressor shall be overhauled when the oil turns dark.
Check the color of the sight glass on the liquid supply pipe. Yellow indicates that the water content of refrigerant is out of limits. Heating: the liquid supply pipe is filled with refrigerant liquid and has no bubble, Cooling: there has no bubble or little bubble at the normal condition.
Check any leakage of the refrigerant circuit. Check any oil strain or leakage around the pipeline.
Check the differential oil pressure. The difference between high pressure and oil pressure shall not exceed 1.5 bar during operation, or the oil filter shall be replaced.
Sign off on the chiller inspection
Chiller Regular Maintenance
Pre-maintenance
a. Contact with other maintenance managers before maintenance.
b. Make sure that you familiar with safety precautions.
c. Please select “Local” on the HMI if you needn’t remote operation to avoid auto-running by remote signals.
d. Warning signs should be hung in a prominent position when the chiller is being maintained.
Regular Maintenance
a. Check the chilled water state.
Change the polluted water in the system if the chilled water quality get worse.
Adjust to a correct value if the Ethylene glycol solution concentration reduces below the setting point.
4 Yearly Chiller Maintenance
Check at intervals as specified and replace when the component is abnormal and the replacing standard is met.
- Bearing (Screw and Star wheel)
- Body
- Screw rotor
- Motor
- Injection expansion valve
- Electric expansion valve(capacity control)
- Oil Filter
- Discharge valve
1 Daily Chiller Inspection
Suction pressure
Discharge pressure
Oil level check through Oil sight glass
Any abnormal sound exists?
Check the motor overload protector (trip or not)
If motor overload protector tripped, state the reason of trip
Discharge superheat degree of compressor
Sign off on the daily chiller inspection
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













