MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Single Screw Chiller ZUW.C-B

Need answers fast?
Explore the manual using AI.

Daikin Single Screw Chiller ZUW.C-B
Daikin Single Screw Chiller ZUW.C-B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Single Screw Chiller ZUW.C-B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Single Screw Chiller ZUW.C-B

Daikin Single Screw Chiller ZUW.C-B

Create an account to install this asset package.

Maintenance Plans for Daikin Single Screw Chiller Model ZUW.C-B

Integrate maintenance plans directly into your work orders in MaintainX.

11 Yearly Chiller Maintenance

Check mark

Check at intervals as specified and replace when the component is abnormal and the replacing standard is met.

Check mark

- Motor

Check mark

- Injection expansion valve

Check mark

- Electric expansion valve(capacity control)

Check mark

- Oil Filter

Check mark

- Discharge valve

Check mark

- Water pressure drop

Check mark

- Expansion valve

Check mark

- Tubes

Run this procedureArrow right

Power Supply Check

Check mark

A) Power supply should meet requirements

Check mark

According to all parameters on nameplate, please confirm voltage is within ±10% of nominal voltage,

Check mark

frequency is within (50) ±2%Hz, and phase voltage unbalance is within ±2% of rated voltage.

Check mark

B) Power on more than 8 hours before operation.

Check mark

In order to start compressor smoothly, starter cabinet should be powered on more than 8 hours to energize oil heater to heat the oil.;

Run this procedureArrow right

13 Yearly Chiller Maintenance

Check mark

Check at intervals as specified and replace when the component is abnormal and the replacing standard is met.

Check mark

- Motor

Check mark

- Injection expansion valve

Check mark

- Electric expansion valve(capacity control)

Check mark

- Oil Filter

Check mark

- Discharge valve

Check mark

- lubricant oil

Check mark

- Water pressure drop

Check mark

- Expansion valve

Run this procedureArrow right

3 Monthly Chiller Maintenance

Check mark

Check at intervals as specified and replace when the component is abnormal and the replacing standard is met.

Check mark

Oil Filter condition

Check mark

Lubricant Oil condition

Check mark

Filter (Water suction conditions) condition

Check mark

Sign off on the chiller maintenance

Run this procedureArrow right

Chiller Regular Maintenance

Check mark

Pre-maintenance

Check mark

a. Contact with other maintenance managers before maintenance.

Check mark

b. Make sure that you familiar with safety precautions.

Check mark

c. Please select “Local” on the HMI if you needn’t remote operation to avoid auto-running by remote signals.

Check mark

d. Warning signs should be hung in a prominent position when the chiller is being maintained.

Check mark

Regular Maintenance

Check mark

a. Check the chilled water state.

Check mark

Change the polluted water in the system if the chilled water quality get worse.

Check mark

Adjust to a correct value if the Ethylene glycol solution concentration reduces below the setting point.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets