Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin Packaged Gas / Electric Unit DFG0724DH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Routine Maintenance
WARNING! ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD
Failure to follow safety warnings exactly could result in dangerous operation, serious injury, death or property damage
Improper servicing could result in dangerous operation, serious injury, death or property damage
Before servicing, disconnect all electrical power to furnace
When servicing controls, label all wires prior to disconnecting. Reconnect wires correctly
Verify proper operation after servicing
WARNING! HIGH VOLTAGE! DISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS UNIT. MULTIPLE POWER SOURCES MAY BE PRESENT. FAILURE TO DO SO MAY CAUSE PROPERTY DAMAGE, PERSONAL INJURY OR DEATH
WARNING! TO PREVENT PERSONAL INJURY OR DEATH DUE TO IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE, REFER TO THIS MANUAL. FOR ADDITIONAL ASSISTANCE OR INFORMATION, CONSULT A QUALIFIED INSTALLER, SERVICE AGENCY OR THE GAS SUPPLIER
CAUTION! SHEET METAL PARTS, SCREWS, CLIPS AND SIMILAR ITEMS INHERENTLY HAVE SHARP EDGES, AND IT IS NECESSARY THAT THE INSTALLER AND SERVICE PERSONNEL EXERCISE CAUTION
2 Monthly Filter Inspection
CAUTION! TO PREVENT PROPERTY DAMAGE DUE TO FIRE AND LOSS OF EQUIPMENT EFFICIENCY OR EQUIPMENT DAMAGE DUE TO DUST AND LINT BUILD UP ON INTERNAL PARTS, NEVER OPERATE UNIT WITHOUT AN AIR FILTER INSTALLED IN THE RETURN AIR SYSTEM
Dirty filters are the most common cause of inadequate heating or cooling performance
Is the air filter installed in the return air system?
Is the air filter clean?
Filter inspection should be made at least every two months; more often if necessary because of local conditions and usage
Next filter inspection date
Sign off on the filter inspection
3 Monthly Filter Replacement
CAUTION! TO PREVENT PROPERTY DAMAGE DUE TO FIRE AND LOSS OF EQUIPMENT EFFICIENCY OR EQUIPMENT DAMAGE DUE TO DUST AND LINT BUILD UP ON INTERNAL PARTS, NEVER OPERATE UNIT WITHOUT AN AIR FILTER INSTALLED IN THE RETURN AIR SYSTEM
Every application may require a different frequency of replacement of dirty filters
Filters must be replaced at least every three months during operating seasons
Dirty throwaway filters should be discarded and replaced with a new, clean filter
Old filter removed?
New filter installed?
Sign off on the filter replacement
MicroChannel Heat Exchanger Maintenance
CAUTION! Prior to servicing MCHE, be sure to disconnect the power supply and use lock-out methods to prevent the power from accidentally being turned on
SHUT DOWN PERIODS
During periods when the MCHE is not operated for longer than a week, the MCHE must be completely cleaned following the cleaning procedure. This practice must also be performed during short shut-down periods where corrosive deposits accumulate on the MCHE
CLEANING PRDOCEDURE
Relative to tube & fin heat exchangers, MicroChannel heat exchanger coils tend to accumulate more dirt on the surface of the coil and less dirt inside the coil, making them easier to clean
STEP 1: Remove Surface Debris
Remove surface dirt, leaves, fibers, etc. with a vacuum cleaner (preferably with a brush or other soft attachment rather than a metal tube), compressed air blown from the inside out, and/or a soft bristle (not wire!) brush. Do not impact or scrape the coil with the vacuum tube, air nozzle, etc
STEP 2: Rinse the coil by following procedure
1. Rinse the coil by approved MCHE cleaner first, or rinsing by water directly
1 Yearly Burner Flame Check
At least once a year, prior to or during the heating season, make a visual check of the burner flames.
NOTE: This will involve removing and reinstalling the heat exchanger door on the unit, which is held by two screws.
If you are uncertain about your ability to do this, contact a qualified servicer.
If a strong wind is blowing, it may alter the airflow pattern within the unit enough that an inspection of the burner flames is not possible.
Was the heat exchanger door successfully removed?
Was the burner flame visually checked?
Was the heat exchanger door successfully reinstalled?
Sign off on the burner flame check
Access the parts list for your equipment in MaintainX.
Flue Extension Kit
HEFLUE048060
Flue Extension Kit
HEFLUE048060
Flue Extension Kit
HEFLUE048060
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX