Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin Outdoor Heat Pump RXS60E3V1B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Hall IC Check
Check the connector connection
Output voltage between pins 1 and 3
Number of pulses generated between pins 2 and 3 when the fan motor is operating
If NG in step 1, what is the defect?
If NG in step 2, what is the defect?
If OK in both steps 1 and 2, what is the action?
Sign off on the Hall IC Check
Thermistor Resistance Check
Warning: Disconnect the connectors of the thermistors from the PCB before proceeding
Thermistors disconnected from the PCB?
Enter the resistance of each thermistor
Select the model of the thermistor
For models directly mounted on the PCB, disconnect the connector for the PCB and measure.
Connector for the PCB disconnected?
Enter the resistance of the thermistor
Sign off on the thermistor resistance check
PCB Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Preparation: Remove the electrical box according to the “Removal of Electrical Box”.
Disconnect the connectors from the service monitor PCB [S52] [S102].
Detach the 4 clamps with pliers.
Remove the screws of the terminal board and the earth wire.
Unfasten the hook on the right.
Open the terminal board.
Disconnect the harnesses.
Disconnect the 2 connectors for the reactor [HR1] [HR2].
Outdoor Fan / Fan Motor Removal
Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
1. Remove the electrical box cover.
Preparation
Remove the top panel and the front panel according to the “Removal of Outer Panels”.
This procedure is not necessary to remove the outdoor fan only.
1 Remove the screw of the shield plate.
2 Unfasten the 2 hooksand remove the shield plate.
3 Unfasten the 4 hooks of the electrical box cover and remove it.
2. Remove the fan motor.
Electronic Expansion Valve Check
EV connector correctly connected to the PCB
EV generates latching sound when power is turned off and on
Continuity present when connector is disconnected and checked with a tester
Check continuity between the following pins
EV coil is not faulty if there is continuity between the pins
Outdoor unit PCB is not faulty if continuity is confirmed
Note: The latching sound varies depending on the valve type
Sign off on the electronic expansion valve check
Access the parts list for your equipment in MaintainX.
Inverter Checker
1225477
Silicon Grease
1172698
Inverter Checker
1225477
Silicon Grease
1172698
Inverter Checker
1225477
Silicon Grease
1172698
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX