Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin Double Skin Modular Air Handling Unit DS2TB-2027
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Electrical Control System Maintenance
Control box & wiring checked for any damage
Was there any need for repair or replacement of control box & wiring?
Protection breaker checked and calibrated
Internal lighting checked for any damage
Was there any need for replacement of internal lighting?
Sign off on the electrical control system maintenance
1 Monthly Fan Maintenance
Check the fan motor for any damage, cracks or detergants. If there is a dust then clean it
Check Belt drive tension of the fan and in case of it re-tighten it
Check V-Belt condition of the fan and in case of the damage replace it
Check the fan for Corrosion
Sign off on the fan maintenance
6 Monthly Fan Maintenance
Fan bearing checked and replaced if damaged
Fan motor bearing checked
Motor temperature of the fan
Bolt & nut secure and tightened if necessary
Obstruction of the intake air checked and cleared if necessary
Sign off on the fan maintenance
Initial 48 Hourly Air Handling Unit Check
CAUTION! HIGH AIR TEMPERATURE IN THE FAN SECTION CAN CAUSE MOTOR OVERHEAT AND DAMAGE. ON DRAW-THROUGH AIR HANDLERS, ADJUST THE DISCHARGE AIR TEMPERATURE OF THE HEATING SECTION NOT TO EXCEED 1040 F (400C)
Make sure to completely isolate the Electrical source
Re-check and Re-tension the drive belts due to stretch
Check and adjust the pulley alignment to ensure the motor fixing is properly secure
Check all bearing, wheel bolts & nuts and sheave set screws (or cap screw) are in secure position
Sign off on the 48 Hourly Air Handling Unit Check
6 Monthly Coil Section Maintenance
Frost protection of the coil section checked
Coil section checked for any leakage
Was there any leakage found?
If leakage was found, clear it
Bolt & nut checked for security
Were any loose bolts or nuts found?
If loose bolts or nuts were found, tighten them
Sign off on the coil section maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX