MaintainX Logo
EnterprisePricing
Crown

Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175

Need answers fast?
Explore the manual using AI.

Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175
Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175

Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175

Create an account to install this asset package.

Maintenance Plans for Crown Gas-Fired Hot Water Sealed Combustion Boiler Model CSC-175

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Boiler Maintenance

Check mark

- The following routine maintenance should be performed on an annual basis:

Check mark

1) Turn off power to the boiler

Check mark

2) Remove the burner tray from the boiler. To do this:

Check mark

a) Remove the intake cover.

Check mark

b) Remove the four allen screws holding the elbow flange onto the gas valve.

Check mark

c) Remove the three 8-32 screws holding the manifold gasket plate to the intake box

Check mark

d) Remove the four ¼-20 nuts holding the burner assembly in the boiler

Check mark

e) Disconnect the ignition wire from the electrode.

Check mark

Carefully remove the burner assembly being careful not to damage the firedoor insulation or the manifold gasket.

Run this procedureArrow right

1 Yearly Heat Exchanger Cleaning

Check mark

Turn off power to the boiler

Check mark

Disconnect the vent system from the boiler by removing the four 10-32 screws holding the vent collar in place

Check mark

Remove the top jacket panel. If possible, remove the rear and left side jacket panels

Check mark

Unplug the fan and remove the fan cover plate

Check mark

Disconnect the pressure switch hoses

Check mark

Remove the burner assembly

Check mark

Remove the two ¼-20 nuts and washers holding the flue collector onto the heat exchanger.

Check mark

Score the silicone seal around the flue collector with a utility knife or similar tool

Check mark

Pry the flue collector off of the heat exchanger, being careful not to damage the flue collector or fan.

Run this procedureArrow right

Boiler Gas Sampling

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Measure CO in flue gas

Check mark

Measure CO2 in flue gas

Check mark

CO and CO2 within acceptable limits?

Check mark

Report any causes of excessive CO or CO2

Check mark

Select orifice size

Check mark

Warning: Do not leave the boiler in service with the intake cover removed

Check mark

Boiler operational with intake cover removed?

Check mark

Measure pressure at flue collector

Run this procedureArrow right

Parts for Crown Gas-Fired Hot Water Sealed Combustion Boiler CSC-175

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Complete Block Assy.

60-018

Left End Section

60-011

Right End Section

60-012

Intermediate Section

60-006

Pushnipple

60-000

Complete Block Assy.

60-018

Left End Section

60-011

Right End Section

60-012

Intermediate Section

60-006

Pushnipple

60-000

Complete Block Assy.

60-018

Left End Section

60-011

Right End Section

60-012

Intermediate Section

60-006

Pushnipple

60-000

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Crown

Explore Other Assets