

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Care Of Sweden Mattress System CuroCell Cirrus
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Blown Fuse Replacement
Upload a photo of the fuse in the holder before removal
Is the fuse blown?
Upload a photo of the new fuse
Is the new fuse properly inserted and fastened?
Any visible damage inside the pump?
Upload a photo of the pump after fuse replacement
Is the pump functioning normally after fuse replacement?
Sign off on the fuse replacement
Buzzer Replacement
Voltage supplied is correct
Connectors and wire leads are not loose
Loosen 2 screws securing the buzzer
Enter the part number from BOM for the new buzzer
Fasten the 2 screws securing the new buzzer
Connect the wire leads connector to the PCB
Sign off on the buzzer replacement
Front Panel Replacement
Warning: Ensure the device is powered off before starting the procedure
Disconnect all wire leads from the PCB
Loosen the air tube from the pressure sensor
Remove the 4 screws from the PCB
Enter the part no. listed from the BOM
Replace with a new PCB according to the part no.
Fasten the 4 screws
Connect all wire lead connectors in the correct positions on the PCB
Connect the pressure sensor tube in the correct position on the PCB
Main PCB Replacement
Warning: Ensure the device is powered off before starting the procedure
Disconnect all wire leads from the PCB
Note of where the wires are connected
Loosen the air tube from the pressure sensor
Remove the 4 screws from the PCB
Enter the part no. listed from the BOM
Replace with a new PCB according to the part no.
Fasten the 4 screws
Connect all wire lead connectors and pressure sensor tube in the correct positions on the PCB
Matress System Adjustment
Assure the voltage supplied from power cord is correct
Switch on the power. The normal power supply light will be illuminated
Press the comfort left/right selection button, and the power button together for 5 seconds, to enter in the calibration procedure
When in the calibration procedure, the On/Off LED will be lit, while the remaining LED lights should not be lit. The compressor will not function as the timing motor is in the repositioning process
When the timing motor repositioning process is finished, the low pressure LED will start flashing. The compressor will start to work and the calibration can begin
Make sure the pump air let is not obstructed, and that the air output is normal
Press the alarm mute button, the low pressure LED will turn off. The LED lights of Comfort 1 and Comfort 2 will light up and flash, and the compressor will stop working. The first part of the calibration is now finished, and the pump is ready to perform the low pressure calibration
Provide a stable 15 mmHg pressure
Press the Alarm mute button, the LED lights of Comfort 1 and Comfort 2 will turn off. After that, the LED lights of Comfort 9 and Comfort 10 will light up and flash, and the compressor will stop working. The low pressure calibration is finished, and the pump is ready to perform the high pressure calibration
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













