Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Bunn Grinder GVH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Grinder Cleaning
Warning: Unplug the grinder before cleaning the grind chamber
Empty all beans from hopper(s)
Run a few cycles until all coffee in the grind chamber is dispensed
Remove the two screws and remove the dial plate and selector knob assembly
Slide the burr auger rotor/spring assembly off the motor shaft and disassemble for cleaning
Remove the two screws securing the stationary burr to the grind chamber. Inspect and clean/replace burrs if necessary
Remove the four screws at the top of the chute and remove the chute. Use a stiff non-metallic bristle brush to remove any debris around the flapper
Wash all parts in a mild solution of detergent with hot water and a stiff non-metallic bristle brush. Rinse all parts thoroughly and allow them to air dry before reinstalling
Carefully clean the grind chamber, dial plate assembly, and chute opening with a dry stiff non-metallic bristle brush. Wipe with a clean cloth that has been soaking in a mild solution of detergent and hot water
1 Weekly Grinder Cleaning
Clean all exterior surfaces
Use a damp cloth rinsed in any mild, nonabrasive, liquid detergent
Care should be taken not to scratch the grinder with any abrasive material
Sign off on the grinder cleaning
Grinder Chute Replacement
Remove four screws from below the number dial
Remove the chute
Replace with the trifecta chute
Replace the four screws from below the number dial
The chute will now hold the cup compatible with the trifecta® single cup, Air Infusion® brewer
Sign off on the grinder chute replacement
6 Monthly Grinder Chamber Maintenance
Grinder chamber cleaned
Burrs inspected and cleaned or replaced if necessary
Zero adjustment of the coffee grinder carried out
Sign off on the grinder chamber maintenance
Access the parts list for your equipment in MaintainX.
Burr Set Kit
05861.1002
Burr Set Kit
11285.1000
Chute Assy
55032.0000
Burr Set Kit
05861.1002
Burr Set Kit
11285.1000
Chute Assy
55032.0000
Burr Set Kit
05861.1002
Burr Set Kit
11285.1000
Chute Assy
55032.0000
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.