MaintainX Logo
EnterprisePricing
Bosch

Bosch Rotary Hammer RH540M

Need answers fast?
Explore the manual using AI.

Bosch Rotary Hammer RH540M
Bosch Rotary Hammer RH540M

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Bosch Rotary Hammer RH540M

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bosch Rotary Hammer RH540M

Bosch Rotary Hammer RH540M

Create an account to install this asset package.

Maintenance Plans for Bosch Rotary Hammer Model RH540M

Integrate maintenance plans directly into your work orders in MaintainX.

Rotary Hammer Maintenance

Check mark

General Warning: Preventive maintenance should only be performed by authorized personnel to avoid potential hazards, including misplacement of internal wires and components. Always have your tool serviced at a Bosch Factory Service Center or an Authorized Bosch Service Station.

Check mark

Tool Lubrication: Your tool has been properly lubricated during manufacture. For maintenance: Use a special gear lubricant at every brush change to regrease the gears.

Check mark

Bearings: Replace bearings every second brush change at a Bosch Factory Service Center or an Authorized Bosch Service Station. Replace noisy bearings immediately to avoid overheating or motor failure.

Check mark

Cleaning Instructions: Safety First: Always disconnect the tool from the power supply before cleaning or performing any maintenance. Wear safety goggles when using compressed air for cleaning.

Check mark

Use compressed dry air to clean the tool.

Check mark

Keep ventilation openings and switch levers clean and free of foreign matter.

Check mark

Avoid inserting pointed objects into openings.

Check mark

Caution: Do not use cleaning agents or solvents that damage plastic parts. Avoid: Gasoline, Carbon tetrachloride, Chlorinated cleaning solvents, Ammonia or ammonia-based detergents.

Check mark

Sign off on the Rotary Hammer Maintenance

Run this procedureArrow right

2 Monthly Carbon Brushes Inspection

Check mark

Warning: This inspection requires trained personnel with PPE!

Check mark

Brushes and commutator in good condition

Check mark

Last inspection date

Check mark

Choose the type of replacement brushes used

Check mark

Upload a photo of the replaced brushes

Check mark

Sign off on the carbon brushes inspection

Run this procedureArrow right

Parts for Bosch Rotary Hammer RH540M

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Motor Housing

1 619 P07 704

Field

1 619 P08 324

Switch

1 619 P10 396

Power Supply Cord

1 614 461 034

Grommet

1 619 P07 722

Motor Housing

1 619 P07 704

Field

1 619 P08 324

Switch

1 619 P10 396

Power Supply Cord

1 614 461 034

Grommet

1 619 P07 722

Motor Housing

1 619 P07 704

Field

1 619 P08 324

Switch

1 619 P10 396

Power Supply Cord

1 614 461 034

Grommet

1 619 P07 722

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bosch

Explore Other Assets