MaintainX Asset Hub logo
EnterprisePricing
Armstrong International

Armstrong International Steam Trap 816

Need answers fast?
Explore the manual using AI.

Armstrong International Steam Trap 816
Armstrong International Steam Trap 816

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Armstrong International Steam Trap 816

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Armstrong International Steam Trap 816

Armstrong International Steam Trap 816

Create an account to install this asset package.

Maintenance Plans for Armstrong International Steam Trap Model 816

Integrate maintenance plans directly into your work orders in MaintainX.

Steam Trap Testing

Check mark

Test Valve Method Setup

Check mark

Ensure shut-off valve is in return line to isolate trap from return header

Check mark

Observation During Test Valve Open

Check mark

Select the observation when test valve is open

Check mark

Troubleshooting

Check mark

Refer to the relevant page for troubleshooting based on observation

Check mark

Post Testing

Check mark

Was the steam trap functioning correctly?

Check mark

Technician's Signature

Run this procedureArrow right

By-Pass Valve Inspection

Check mark

Initial Inspection

Check mark

Ensure the by-pass valve is closed

Check mark

Is the by-pass valve steam tight?

Check mark

Operational Check

Check mark

Can the trap operate without the by-pass valve?

Check mark

Remove the by-pass valve if it is not necessary for operation

Check mark

Post Inspection Guidelines

Check mark

Avoid opening the by-pass valve unnecessarily

Check mark

Ensure the by-pass valve remains closed after inspection

Run this procedureArrow right

Steam Trap Guide Pins Maintenance

Check mark

Guide Pins Alignment Check

Check mark

Hold the lever assembly against the valve seat with the valve contacting its seat

Check mark

Ensure the two fulcrum points are resting on the face of the seat

Check mark

Are the guide pins central in the guide pin holes?

Check mark

Is there equal side-to-side movement of the lever?

Check mark

Guide Pins Adjustment

Check mark

Bend the pins until they are centrally located

Check mark

Ensure pins remain perpendicular to the guide pin plate

Check mark

Verify the lever can drop until it rests on the guide pin hooks

Run this procedureArrow right

Steam Trap Cleaning

Check mark

Trap Cleaning

Check mark

Remove all sediment and dirt from the trap body

Check mark

Immerse mechanism in approved cleaning fluid if required

Check mark

Backflushing Stainless Steel Traps

Check mark

Backflush with compressed air or water under pressure

Check mark

Strainer Installation and Maintenance

Check mark

Install a strainer ahead of the trap if there is an exceptional amount of dirt

Check mark

Determine strainer maintenance frequency

Run this procedureArrow right

Steam Trap Lever and Guide Pin Assembly Replacement

Check mark

Preparation

Check mark

Ensure the steam trap is isolated from the system

Check mark

Gather necessary tools and replacement parts

Check mark

Disassembly

Check mark

Remove the old lever and guide pin assembly

Check mark

Installation

Check mark

Install the new lever and guide pin assembly

Check mark

Check if the new assembly is properly aligned and secured

Check mark

Post-Installation Check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Armstrong International

Explore Other Assets