MaintainX Logo
EnterprisePricing
ABB

ABB Low Voltage Air Circuit-Breakers SACE Emax 2

Need answers fast?
Explore the manual using AI.

ABB Low Voltage Air Circuit-Breakers SACE Emax 2
ABB Low Voltage Air Circuit-Breakers SACE Emax 2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for ABB Low Voltage Air Circuit-Breakers SACE Emax 2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

ABB Low Voltage Air Circuit-Breakers SACE Emax 2

ABB Low Voltage Air Circuit-Breakers SACE Emax 2

Create an account to install this asset package.

Maintenance Plans for ABB Low Voltage Air Circuit-Breakers Model SACE Emax 2

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Maintenance

Check mark

- One year or 20% of mechanical life or 20% of electrical life in standard environments; 6 months or 10% of mechanical life or 10% of electrical life in dusty environments (dust level measured > 1mg/m³).

Check mark

- Even circuit-breakers that are operated infrequently or that remain closed or open for long periods of time must be subjected to programmed maintenance.

Check mark

- All the circuit-breakers provide information on the number of operations carried out. With Ekip Dip releases, the information can be obtained with the aid of Ekip T&P and a PC on which the Ekip Connect software is installed. With Ekip Touch releases, the information is available at any time on the appropriate display. With Ekip Dip releases, installation of the mechanical operation counter is recommended (supplied on request).

Check mark

- During the service, visually inspect the circuit-breaker from the outside to check for the presence of dust, dirt, or damage.;

Run this procedureArrow right

3 Yearly Maintenance

Check mark

- Three years or 50% of mechanical life or 50% of electrical life or after a trip under short-circuit in standard environments; 18 months or 25% of mechanical life or 25% of electrical life or after a trip under short-circuit in dusty environments (dust level measured > 1mg/m³).

Check mark

- Even circuit-breakers that are operated infrequently or that remain closed or open for long periods of time must be subjected to programmed maintenance.

Check mark

- All the circuit-breakers provide information on the number of operations carried out. With Ekip Dip releases, the information can be obtained with the aid of Ekip T&P and a PC on which the Ekip Connect software is installed. With Ekip Touch releases, the information is available at any time on the appropriate display. With Ekip Dip releases, installation of the mechanical operation counter is recommended (supplied on request).

Check mark

- During the service, visually inspect the circuit-breaker from the outside to check for the presence of dust, dirt, or damage.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from ABB

Explore Other Assets