MaintainX Asset Hub logo
EnterprisePricing
Yokogawa

Yokogawa Magnetic Flowmeter AE220-MG

Need answers fast?
Explore the manual using AI.

Yokogawa Magnetic Flowmeter AE220-MG
Yokogawa Magnetic Flowmeter AE220-MG

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Yokogawa Magnetic Flowmeter AE220-MG

Yokogawa Magnetic Flowmeter AE220-MG

Create an account to install this asset package.

Maintenance Plans for Yokogawa Magnetic Flowmeter Model AE220-MG

Integrate maintenance plans directly into your work orders in MaintainX.

Sealing Inspection

Check mark

Confirmation of Sealing Condition

Check mark

Confirm the sealing conditions of the following

Check mark

Are drain plugs or waterproof glands provided for conduit piping?

Check mark

Regular Inspections

Check mark

Inspect the sealing condition as previously mentioned

Check mark

Inspect the inside of the terminal box

Check mark

Is there any suspicion of water penetration into the flowmeter?

Check mark

If water penetration is suspected, describe the circumstances (e.g., rainfall)

Run this procedureArrow right

Fuse Replacement

Check mark

Safety Precautions

Check mark

Ensure the power supply is turned OFF

Check mark

Disconnect the power source

Check mark

Fuse Replacement Process

Check mark

Remove the display to access the fuse holder

Check mark

Locate and remove the blown fuse

Check mark

Retrieve the spare fuse from the converter cover

Check mark

Install the new fuse ensuring it is the specified type

Check mark

Post Replacement Check

Run this procedureArrow right

Equipment Loop Test

Check mark

Settings for Test Output Using Data Setting Keys

Check mark

Verify current output settings

Check mark

Ensure functions are returned to original status during flow rate measurements

Check mark

Setting for Test Output Via the BT200

Check mark

Verify current output settings

Check mark

Ensure functions are returned to original status during flow rate measurements

Check mark

Important Considerations

Check mark

Ensure test outputs take priority over flow signal

Check mark

Is the OUTPUT FUNCTION set to BI DIRECTION?

Run this procedureArrow right

Flameproof Apparatus Maintenance

Check mark

Maintenance Servicing with Power On

Check mark

Is the power turned off during maintenance servicing?

Check mark

Use a gas detector to check for explosive gas presence

Check mark

Limit maintenance servicing to the following if explosive gas presence cannot be checked

Check mark

Visual Inspection

Check mark

Inspect flameproof apparatus for damage or corrosion

Check mark

Inspect metal conduits and cables for mechanical and structural defects

Check mark

Zero and Span Adjustments

Check mark

Were adjustments made without opening the equipment cover?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Yokogawa

Explore Other Assets