Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Chiller Maintenance
Clean all water strainers in the water piping system
Inspect waterbox coatings within the first 1–3 months to determine a required maintenance schedule for your job site
Inspect waterbox anodes within the first 1–3 months to determine a required maintenance schedule for your job site
Sign off on the 3 Monthly Chiller Maintenance
1 Yearly Control Circuits Inspection
Shut down the chiller
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
1 Yearly Purge Unit Inspection
Shut down the chiller
Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified
Review purge pump-out data
Review overall operation of purge and service as necessary
Sign off on the purge unit inspection
1 Yearly Oil System Inspection
- Shut down the chiller once each year to check the items of Oil System
1. Perform Annual oil analysis (follow recommendations)
2. Clean and lubricate oil system as required
3. Electrical inspection
4. Pump motor continuity check
5. Run oil pump and check differential oil pressure;
6 Monthly Chiller Lubrication
- Lubricate the vane control linkage bearings, ball joints, and pivot points
- Lubricate vane operator tang O- rings
- Lubricate the oil filter shutoff valve O-rings;
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX