MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L
Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 350-910 - 957 - 142L / 142L

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Chiller Maintenance

Check mark

Clean all water strainers in the water piping system

Check mark

Inspect waterbox coatings within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Inspect waterbox anodes within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Sign off on the 3 Monthly Chiller Maintenance

Run this procedureArrow right

1 Yearly Control Circuits Inspection

Check mark

Shut down the chiller

Check mark

Verify control parameters

Check mark

Test appropriate sensors for accuracy

Check mark

Ensure sensors are properly seated in wells with thermopaste installed

Check mark

Check evaporator leaving water temperature low temperature cutout setpoint

Check mark

Condenser high pressure switch check-out

Check mark

Check adjustment and operation of the inlet guide vane actuator

Check mark

Sign off on the control circuits inspection

Run this procedureArrow right

1 Yearly Purge Unit Inspection

Check mark

Shut down the chiller

Check mark

Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified

Check mark

Review purge pump-out data

Check mark

Review overall operation of purge and service as necessary

Check mark

Sign off on the purge unit inspection

Run this procedureArrow right

1 Yearly Oil System Inspection

Check mark

- Shut down the chiller once each year to check the items of Oil System

Check mark

1. Perform Annual oil analysis (follow recommendations)

Check mark

2. Clean and lubricate oil system as required

Check mark

3. Electrical inspection

Check mark

4. Pump motor continuity check

Check mark

5. Run oil pump and check differential oil pressure;

Run this procedureArrow right

6 Monthly Chiller Lubrication

Check mark

- Lubricate the vane control linkage bearings, ball joints, and pivot points

Check mark

- Lubricate vane operator tang O- rings

Check mark

- Lubricate the oil filter shutoff valve O-rings;

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142L / 142L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets