MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L
Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L

The Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L is a high-efficiency cooling solution designed for industrial applications. Known for its reliability and performance, this chiller optimizes energy use while providing robust cooling capabilities. Ideal for large facilities, it ensures consistent temperature control and operational efficiency.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 350-570 - 588 - 080L / 080L

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Chiller Maintenance

Check mark

- Check the chiller’s evaporator and condenser pressures, oil tank pressure, differential oil pressure, and discharge oil pressure

Check mark

- Compare the readings with the values provided in the general maintenance

Check mark

- Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass

Check mark

- Complete logs on a daily basis.

Run this procedureArrow right

6 Monthly Chiller Lubrication

Check mark

- Lubricate the vane control linkage bearings, ball joints, and pivot points

Check mark

- Lubricate vane operator tang O- rings

Check mark

- Lubricate the oil filter shutoff valve O-rings;

Run this procedureArrow right

1 Yearly Optional Accessories Maintenance

Check mark

- Shut down the chiller once each year to check the items of Optional Accessories

Check mark

1. If applicable, lubricate factory-installed gantries

Check mark

2. After the first month of operation, inspect Heresite® or Belzona® coated waterboxes; thereafter, inspect as needed

Check mark

3. Inspect anodes

Check mark

4. Inspect and lubricate hinged waterboxes

Check mark

5. With water flow sensing option, bleed tubing from waterboxes to transformers;

Run this procedureArrow right

1 Yearly Oil System Inspection

Check mark

- Shut down the chiller once each year to check the items of Oil System

Check mark

1. Perform Annual oil analysis (follow recommendations)

Check mark

2. Clean and lubricate oil system as required

Check mark

3. Electrical inspection

Check mark

4. Pump motor continuity check

Check mark

5. Run oil pump and check differential oil pressure;

Run this procedureArrow right

2 Monthly Sacrificial Anodes Replacement

Check mark

- The replacement schedule for the optional zinc or magnesium anodes can vary greatly with the aggressiveness of the water that is in the system

Check mark

- Some sites could require anode replacement every two to three months while other sites may require anode replacement every two to three years

Check mark

1. Trane recommends inspection of anodes for wear sometime within the first several months of the anodes being placed into service

Check mark

2. If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened

Check mark

3. Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass

Check mark

4. If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application

Check mark

NOTICE

Check mark

Equipment Damage!

Check mark

Failure to follow instructions could result in equipment damage

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 080L / 080L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets