The Trane CenTraVac™ Water-Cooled Chiller CVHF model, ranging from 350 to 570 tons, is designed for high efficiency and reliability in industrial applications. This chiller provides optimal cooling performance while minimizing energy consumption, making it a preferred choice for large facilities.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 050L / 080L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Exterior Parts Maintenance
- Shut down the chiller once each year to check the items of Exterior
1. Inlet guide vane linkage
2. Clean and touch-up painted surfaces as needed
3. Repair deteriorated, torn, or missing insulation;
2 Monthly Sacrificial Anodes Replacement
- The replacement schedule for the optional zinc or magnesium anodes can vary greatly with the aggressiveness of the water that is in the system
- Some sites could require anode replacement every two to three months while other sites may require anode replacement every two to three years
1. Trane recommends inspection of anodes for wear sometime within the first several months of the anodes being placed into service
2. If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened
3. Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass
4. If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application
NOTICE
Equipment Damage!
Failure to follow instructions could result in equipment damage
General Chiller Maintenance
- Check chiller for normal operation
1. Condenser pressure is dependent on condenser water temperature, and should equal the saturation pressure of the refrigerant at a temperature above that of leaving condenser water at full load
2. Normal pressure readings for ASME condenser exceed 12 psig (82.7 kPaG)
3. Oil tank pressure: -9 to -6 psig (-62.1 to -41.4 kPaG). Discharge oil pressure: 7 to 15 psig (48.3 to 103.4 KPaG)
4. Approximate Evaporator Pressure: 6 to 9 psia (41.4 to 62.1 kPaA) / -9 to -6 psig (-62.1 to -41.4 kPaG)
5. Approximate Condenser: Pressure(a) , (b) 17 to 27 psia (117.2 to 182.2 kPaA) / 2 to 12 psig (13.8 to 82.7 kPaG) (standard condenser)
6. Oil Sump Temperature Unit not running: 140°F to 176°F (60.0°C to 80.0°C)
7. Oil Sump Temperature Unit running: 95°F to 162ºF (35.0°C to 72.2°C)
8. Oil Sump Differential: Oil Pressure(c) 18 to 22 psid (124.1 to 151.7 PaD)
1 Yearly Condenser Inspection
- Shut down the chiller once each year to check the items of Condenser
1. Inspect for fouling and scaling in tubes
2. Check operation of condenser water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
6 Monthly Chiller Lubrication
- Lubricate the vane control linkage bearings, ball joints, and pivot points
- Lubricate vane operator tang O- rings
- Lubricate the oil filter shutoff valve O-rings;
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX