MaintainX Asset Hub logo
EnterprisePricing
Starrett

Starrett Vision Metrology System AV450

Need answers fast?
Explore the manual using AI.

Starrett Vision Metrology System AV450
Starrett Vision Metrology System AV450

The Starrett Vision Metrology System AV450 is a precision optical measurement tool designed for high accuracy in industrial applications. This advanced system offers reliable performance and is essential for quality control and inspection processes in manufacturing environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Starrett Vision Metrology System AV450

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Starrett Vision Metrology System AV450

Starrett Vision Metrology System AV450

Create an account to install this asset package.

Maintenance Plans for Starrett Vision Metrology System Model AV450

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Vision Metrology System Inspection

Check mark

Area around the system has proper clearance

Check mark

No debris or loose items around the system and the metrology stage

Check mark

Work area is clean, dry and free of debris

Check mark

Electrical power cord is plugged into a grounded power source and is unobstructed

Check mark

Environmental conditions (temperature and humidity) are within recommended ranges

Check mark

System has warmed up to normal operating temperature before performing critical part measurements

Check mark

Stage control mechanisms move freely

Check mark

On CNC Systems, zoom mechanism operates freely through the software

Run this procedureArrow right

1 Monthly Calibration Verification

Check mark

Calibration should be verified periodically depending on user requirements and systems usage, and should be at least monthly.

Check mark

Calibration should also be verified after the system has been serviced or moved.

Check mark

The following is a brief description of the steps recommended for the verification of your machine.

Check mark

Place the calibrated verification standard in one the six positions on the glass stage as shown above. Secure the standard with hot melt glue or other suitable retaining method so that stage translation can not move the standard under any condition.

Check mark

Skew the center of the two end circles. Please refer to the M3 manual for proper alignment procedures.

Check mark

Measure the distance between the 1st and 2nd, 1st and 3rd, 1st and 4th, 1st and 5th, and the 1st and 6th fiducials. Repeat these measurements 10 times.

Check mark

Calculate the absolute average deviation for each of the 5 groups of distance measurements.

Check mark

Repeat the measurements for all six locations shown in the illustration.

Check mark

The absolute averages should be within the factory specification, de-rated for the environment and calibration accuracy. See Table 1 - 5, “Travel, Accuracy and Resolution Specifications” for accuracy specifications.

Run this procedureArrow right

6 Monthly Lead-Screw Lubrication

Check mark

Warning: Use only approved lubricants, as inappropriate lubricants can damage system components.

Check mark

Is the lubricant Tri-Flow®?

Check mark

If the lubricant is not Tri-Flow®, stop the procedure and contact Starrett or an authorized Starrett representative.

Check mark

Enter the amount of Tri-Flow® used

Check mark

Did you traverse the stage or column through the entire range of travel several times to distribute the lubricant?

Check mark

Did you use a clean soft cloth or paper towel to wipe up any excess?

Check mark

Sign off on the lubrication process

Run this procedureArrow right

6 Monthly Vision Metrology System Calibration

Check mark

Warning: Only authorized Starrett technicians should perform this service

Check mark

System functioning properly?

Check mark

Enter the system's usage hours

Check mark

Is the system under heavy usage?

Check mark

If system is under heavy usage, it may require more frequent service

Check mark

Technician's signature

Run this procedureArrow right

Auxiliary Lens Replacement

Check mark

Warning: Avoid touching any lens surfaces during the procedure.

Check mark

Ring light removed prior to changing the lens?

Check mark

If an auxiliary lens is in place, was it unscrewed counterclockwise?

Check mark

Are the new lens and exposed lens of the primary optics assembly clean and dust free?

Check mark

Was the aux lens carefully screwed in clockwise, finger-tight only?

Check mark

Was the lens setting updated in the QC5000 software?

Check mark

Upload a photo of the installed lens.

Check mark

Sign off on the lens replacement

Run this procedureArrow right

Parts for Starrett Vision Metrology System AV450

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Stage Glass

5485

Stage Glass

5485

Stage Glass

5485

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Starrett

Explore Other Assets