

The Schneider Electric Compressor PEM 500-15-50 B is a high-performance industrial compressor designed for efficient operation in various applications. With robust features and reliable performance, this model ensures optimal air compression and energy efficiency, making it an ideal choice for industrial environments.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Schneider Electric Compressor PEM 500-15-50 B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1000 Hourly Replacement
- Change oil (synthetic oil):
1. Allow the compressor to warm up, switch it off, disconnect the power supply.
2. Pull out the oil filler plug or oil dipstick (item 03), hold the used oil container under the oil filler plug (item 04), screw open the oil drain screw, drain used oil completely.
3. Screw the oil drain screw closed.
4. Add the prescribed quantity of oil.
5. Check the oil level, correct if necessary. Insert the oil filler plug or oil dipstick.
6. Dispose of used oil according to applicable regulations.
As the mineral oil, we recommend Art. No.B111002, synthetic oil Art. No. B111006. Using incorrect oils shall void the warranty. Mixing synthetic and mineral oil can dam- age the compressor!
- Change V-belts (where applicable): V-belt driven compressors:
10 Yearly Pressure Test
This compressor is subject to a type approval inspection. As a result, inspections by an authorised expert prior to commissioning are no longer necessary. The prototype identification code is located on the compressor specification plate.
We recommend that a "qualified person" perform a pressure test on the vessel after 10 years, depending on general levels of wear and tear.
A "qualified person" should be well informed about Ordinance on Industrial Safety and Health (formerly authorised expert)
Contact any of our approved service partners. Most of our service partners have employees with expert qualifications.
2500 Hourly Replacement
- Change safety valve:
1. Detach the safety valve (item 11) by unscrewing it anticlockwise.
2. Screw the new safety valve into place by screwing it clockwise.
500 Hourly Maintenance
- Change oil (mineral oil):
1. Allow the compressor to warm up, switch it off, disconnect the power supply.
2. Pull out the oil filler plug or oil dipstick (item 03), hold the used oil container under the oil filler plug (item 04), screw open the oil drain screw, drain used oil completely.
3. Screw the oil drain screw closed.
4. Add the prescribed quantity of oil.
5. Check the oil level, correct if necessary. Insert the oil filler plug or oil dipstick.
6. Dispose of used oil according to applicable regulations.
As the mineral oil, we recommend Art. No.B111002, synthetic oil Art. No. B111006. Using incorrect oils shall void the warranty. Mixing synthetic and mineral oil can dam- age the compressor!
- Change intake filter:
50 Hourly Maintenance
- Check V-belt tension (where applicable):
V-belt driven compressors:
1. Switch off the petrol engine.
2. Remove the mounting plugs, take off the belt guard grating.
Checking V-belt tension:
Press down on the V-belt at the top using your thumb, halfway between the V-belt discs. The belt should not give more the width of the V-belt (Figure 8a).
Adjusting V-belt tension:
1. Mark the position of the petrol motor on the base plate.
2. Unscrew the mounting screws of the motor (Figure 8b).
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













