Mazak Vertical Machining Center VTC-200C

Need answers fast?
Explore the manual using AI.

Mazak Vertical Machining Center VTC-200C
Mazak Vertical Machining Center VTC-200C

The Mazak Vertical Machining Center VTC-200C is a high-performance CNC machine designed for precision machining tasks. Known for its reliability and efficiency, this model excels in various industrial applications, making it a preferred choice for manufacturers seeking advanced machining solutions.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mazak Vertical Machining Center VTC-200C

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mazak Vertical Machining Center VTC-200C

Mazak Vertical Machining Center VTC-200C

Create an account to install this asset package.

Maintenance Plans for Mazak Vertical Machining Center Model VTC-200C

Integrate maintenance plans directly into your work orders in MaintainX.

1500 Hours / 6 Monthly Coolant Tank Maintenance

Check mark

CAUTION: If coolant, oil or other fluid gets spilled on the floor, wipe it off with a cloth and dry the floor immediately. If the floor remains wet with spilled fluid, personnel could slip over and be injured

Check mark

Pull out the tank to the machine front side

Check mark

Remove the filters, bucket, coolant pump, and top cover from the coolant tank. If the machine is equipped with the chip conveyor, remove the chip conveyor too

Check mark

Pump the coolant from the coolant tank

Check mark

If coolant level becomes low and pumping becomes impossible, loosen the drain plug of the coolant tank to completely discharge coolant from the coolant tank

Check mark

When the coolant is completely discharged from the coolant tank, remove chips and sludge deposited at the bottom of the tank

Check mark

Clean the inside of the coolant tank with rag

Check mark

After cleaning the coolant tank, refit the drain plug and other parts removed

Check mark

Supply new coolant to the coolant tank

Run this procedureArrow right

1500 Hours / 6 Monthly Hoses Maintenance

Check mark

CAUTION: Switch off the power before checking hoses on moving units for damage. Otherwise, you may sustain serious or fatal injury

Check mark

Main power disconnect placed to the 'OFF' position

Check mark

Hoses at the rear of the machine checked for damage

Check mark

Hoses checked for damage such as cracks, abnormal bulge, and deterioration

Check mark

Any damage found?

Check mark

If any damage is found, describe it

Check mark

Sign off on the hoses maintenance

Run this procedureArrow right

1500 Hours / 6 Monthly Hydraulic Oil Maintenance

Check mark

CAUTION: Shut off the power before changing the hydraulic oil. Use only the oil specified by Yamazaki Mazak.

Check mark

Switch off the power by placing the main power disconnect to the 'OFF' position

Check mark

Place the oil collecting can (min. capacity: 10 L (2.64 gal)) under the drain port

Check mark

Loosen the drain plug

Check mark

Wind a seal tape around the drain plug, and tighten the drain plug

Check mark

Remove the wire to the pump from the terminal box

Check mark

Remove the wire to the fan from the connector

Check mark

Remove all the hoses from the hydraulic unit

Check mark

Remove the tank

Run this procedureArrow right

1500 Hours / 6 Monthly Hydraulic Oil Replacement

Check mark

Warning: Ensure the main power disconnect is in the 'OFF' position before starting

Check mark

Drain plug loosened and oil discharged

Check mark

Drain plug tightened

Check mark

Amount of fresh oil supplied (in L)

Check mark

Type of oil used

Check mark

When changing oil of HPU 10 L (2.64 gal), clean the filter at the same time (p.94)

Check mark

Type of oil used for HPU

Check mark

Sign off on the hydraulic oil replacement

Run this procedureArrow right

1500 Hours / 6 Monthly Machine Maintenance

Check mark

CAUTION: Since the machine may move unexpectedly, leading to a hazardous situation if a safety device is faulty, do not rest your body, or leave any unnecessary objects, on the moving units or within the range of movement of the units when performing inspections

Check mark

If an abnormality is found in the inspection, contact your local Mazak Technical Center or Mazak's distributor

Check mark

Operator’s door interlock operates correctly

Check mark

Check the air unit drain function. The automatic drain function of the mist separator is faulty in the following cases

Check mark

Air is always leaking through the drain port

Check mark

Corrective action: Turn the drain port in the '→ S' direction for closing. If the air still leaks, refer to 5-5 'Pneumatic System' for the corrective action to be taken

Check mark

Large amount of water is discharged from the drain port when the drain port is turned in the 'O <-- ' direction

Check mark

Corrective action: The mist separator must be changed

Check mark

CAUTION: Set the main power disconnect to the 'OFF' position before entering the machine. Otherwise, you may sustain serious or fatal injury

Run this procedureArrow right

Parts for Mazak Vertical Machining Center VTC-200C

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Air Unit Element Assy

G48SV00130A

Anchor Bolt

34946110050

Block

45576105340

Block

44856102010

Bolt

44966111020

Air Unit Element Assy

G48SV00130A

Anchor Bolt

34946110050

Block

45576105340

Block

44856102010

Bolt

44966111020

Air Unit Element Assy

G48SV00130A

Anchor Bolt

34946110050

Block

45576105340

Block

44856102010

Bolt

44966111020

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX