

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Kennedy Valve Company Gate Valve FS-RW
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Resilient Disk Replacement
Pre-Replacement Checks
Is the valve fully out of service?
Is the valve closed tightly?
Open the valve about five turns to flush debris
Describe any systematic problems causing disc failure
Preparation
Contact Kennedy Valve or an authorized distributor to obtain necessary parts
Disc Replacement Procedure
Partially open the valve
Stem Seal Replacement
Valve Operation
Apply torque for valves 3” and smaller (ft-lbs)
Apply torque for valves 4” and larger (ft-lbs)
Stuffing Box Removal
Remove the nuts retaining the stuffing box [item R4]
Separate the stuffing box [item R5] and the cover [item R11]
O-Ring Replacement
Remove and replace the o-rings
Wipe all grit and dirt from the bore of the stuffing box and stem
Packing Gland Replacement
Disassembly
Remove the packing gland fasteners [item R8]
Remove the cover fasteners [item R6]
Rotate the hand wheel in 'valve closing direction' to disengage yoke nut threads from stem threads
Lift the cover assembly off the stem
Packing Removal and Replacement
Remove and discard the old packing [item R11] and packing gland [item R10]
Position the new packing gland into the packing well of the cover [item R7]
Reassembly
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













