

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Kennedy Valve Company Gate Valve UL (262) 4"
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Resilient Disk Replacement
Pre-Replacement Checks
Is the valve fully out of service?
Is the valve closed tightly?
Open the valve about five turns to flush debris
Describe any systematic problems causing disc failure
Contact for Replacement Parts
Contact Kennedy Valve or an authorized distributor to obtain
Disc Replacement Procedure
Partially open the valve
Stem Seal Replacement
Operate the valve to its full position
Remove the nuts retaining the stuffing box
Separate the stuffing box and the cover
Remove and replace the o-rings
Check the o-rings and gasket seal placement
Use adhesive for o-ring retention
Replace the stuffing box
Check the stem for binding by operating the valve
Packing Gland Replacement
Disassembly
Remove the packing gland fasteners [item R8]
Remove the cover fasteners [item R6]
Rotate the hand wheel in 'valve closing direction' until the yoke nut [item R5] disengages the stem [item 14]
Lift the cover assembly off the stem [item R14]
Packing Removal and Replacement
Remove and discard the old packing [item R11] and packing gland [item R10]
Position the new packing gland into the packing well of the cover [item R7]
Reassembly
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













