

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Keeprite Refrigiration Condensing Unit KMS130L6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Weekly Condensing Unit Inspection
System Operational Check List
Enter the compressor discharge pressure
Enter the compressor suction pressure
Are the compressor pressures within allowable design limits?
Check the liquid line sight glass and expansion valve operation
Is the system low on refrigerant?
Check the level of oil in the compressor sight glass
Add oil to the compressor if necessary
Check thermostatic expansion valve for proper superheat settings
Refrigerant System Leak Testing
Initial Leak Testing
Pressurize the system to a maximum of 150 psig (1136 kPa) with dry nitrogen
Is the system free of major leaks?
Detailed Leak Testing for A1 Refrigerants
Discharge the initial dry nitrogen charge and add refrigerant to raise the system pressure up to 10 psig (170 kPa)
Add dry nitrogen to increase the system pressure to a maximum of 150 psig (1136 kPa)
Use an electronic leak detector to check for leaks
Hold the pressure for a minimum of 12 hours and recheck for leaks
Is the system leak free after 12 hours?
Compressor Superheat Check
Compressor Superheat Measurement
Measure the suction pressure at the suction service valve of the compressor
Determine the saturated temperature from the Pressure-Temperature chart
Measure the suction temperature of the suction line
Calculate the actual superheat at the compressor
System Balancing Considerations
Is the suction superheat within the range of 20 to 45 °F (11.2 to 25.2 °C)?
Adjust the suction superheat if necessary
System Capacity and Safety Notes
6 Monthly Condensing Unit Maintenance
Pre-maintenance Safety
Disconnect and lock off the main power supply to avoid accidental start up of the equipment.
Electrical System Inspection
Check electrical components and tighten any loose connections.
Check all wiring and electrical insulators.
Check contactors for proper operation and contact point wear.
Fan and Motor Inspection
Are fan motors operational?
Ensure fan blades are tight and all mounting bolts are secure.
Condensing Unit Inspection
Pre-Start Checks
Check that all electrical and refrigeration connections are tight
Check compressor crankcase oil level (if equipped with sight glass)
Ensure compressor shipping spacers or hold down nut are properly in place
Check that the compressor discharge and suction shut-off valves are open
Ensure that all safety controls are adjusted properly
Is the room thermostat set for normal operation?
Motor and Fan Checks
Check all motors, fans, and pump bearings in the condenser and evaporator
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













