Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Keeprite Refrigiration Condensing Unit KEHA008M8
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Air Condenser Inspection
Pre-Inspection Safety Measures
Disconnect and lock off the main power supply to avoid accidental start up of the equipment.
Electrical System Inspection
Check electrical components and tighten any loose connections.
Check all wiring and electrical insulators.
Check contactors to ensure proper operation and contact point for wear.
Fan and Motor Inspection
Check that fan motors are operational.
Ensure fan blades are tight.
Air Condenser Leak Testing
IMPORTANT: Leak Testing Overview
Ensure all system piping, including the evaporator and accessories, are thoroughly tested for leaks prior to start up and charging.
Initial Pressurization
Pressurize the system to a maximum of 150 psig (1136 kPa) with dry nitrogen.
Is the system free of major leaks?
Detailed Leak Check for A1 Refrigerants
Discharge the initial dry nitrogen charge.
Add enough refrigerant to raise the system pressure up to 10 psig (170 kPa).
Add dry nitrogen to increase the system pressure to a maximum of 150 psig (1136 kPa).
Air Condenser Dehydration
Preparation
Use larger size hoses or copper lines
Perform oil change on vacuum pump at the beginning of each evacuation
Check vacuum pump, manifold, and hose assembly for ability to pull below 250 microns
Evacuation Setup
Evacuate system from access points
Ensure all solenoids in the system are open (energized) during evacuation
Ensure all ball valves in the system are open and all service valves are appropriately cracked or back-seated during evacuation
Deep Vacuum Method
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX