Ingersoll Rand Air Compressor SSR-MM55

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Air Compressor SSR-MM55
Ingersoll Rand Air Compressor SSR-MM55

The Ingersoll Rand SSR-MM55 is a robust air compressor designed for industrial applications, providing reliable performance and efficiency. With its advanced technology and durable construction, this model ensures optimal air delivery and minimal downtime, making it an essential asset for various operations.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Air Compressor SSR-MM55

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Air Compressor SSR-MM55

Ingersoll Rand Air Compressor SSR-MM55

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Air Compressor Model SSR-MM55

Integrate maintenance plans directly into your work orders in MaintainX.

Coolant-Lubricant Separator Element Replacement

Check mark

CAUTION! Shut down the compressor, close the service air line isolation valve and open the main electrical disconnect switch. Confirm all air pressure is relieved from receiver.

Check mark

Differential pressure across the element reaches three times the initial pressure drop or a maximum of 15 psi at full load?

Check mark

Differential pressure dropped to zero?

Check mark

Scavenge tube at the airend disconnected?

Check mark

Fitting that holds the scavenge tube into the tank loosened and tube assembly withdrawn?

Check mark

Piping from the receiver cover disconnected?

Check mark

Tank cover bolts removed and cover lifted up and away?

Check mark

Separator element lifted up and out of the tank?

Check mark

Gasket surface on both the tank and its cover cleaned?

Run this procedureArrow right

2000 Hourly Coolant Filter Element Replacement

Check mark

WARNING! Confirm all pressure is relieved from the compressor system and that the main electric disconnect switch is open and tagged to remain open.

Check mark

Pressure relieved from the compressor system?

Check mark

Main electric disconnect switch is open and tagged to remain open?

Check mark

Place a suitable container under the filter housing drain valve which is located near the bottom of the housing.

Check mark

Container placed under the filter housing drain valve?

Check mark

Remove the bolt at the bottom of the housing. This will free the housing and element from the filter head. Remove the 'O' ring gasket.

Check mark

Bolt and 'O' ring gasket removed?

Check mark

Inspect the element and housing for foreign particles which have been trapped in the element and also for general overall condition - then discard the element and clean the housing.

Check mark

Element and housing inspected and cleaned?

Run this procedureArrow right

Drive Motor Bearing Maintenance-stored Units

Check mark

284T THROUGH 449TDZ FRAME DRIVE MOTORS

Check mark

Rotate the drive motor several revolutions by hand in the proper direction of rotation

Check mark

Rotate the motor at three month intervals until the unit is placed in service

Check mark

Next rotation date

Check mark

If the storage time should exceed a total of six (6) months duration, re-grease the motor

Check mark

Type of grease used

Check mark

Amount of grease used

Check mark

After re-greasing, continue to rotate the motor at three (3) month intervals

Check mark

Next rotation date after re-greasing

Run this procedureArrow right

8000 Hourly / 1 Yearly Lubricant Replacement

Check mark

Warning: No drainage points should be opened until the compressor has been isolated electrically and all air pressure has been removed from the system.

Check mark

Is the compressor isolated electrically and all air pressure removed from the system?

Check mark

Warning: Extreme care should be exercised when draining the hot lubricant so that no possibility of injury to personnel exists.

Check mark

Has the lubricant been drained soon after the compressor has been shut down?

Check mark

Has a new filter element been installed?

Check mark

Enter the amount of fresh lubricant added (in gallons)

Check mark

Is the receiver level of lubricant up to the mid-point of the gauge glass?

Check mark

Has the compressor been run for a short while?

Check mark

Has the lubricant level in the receiver been checked after shutting down the compressor?

Run this procedureArrow right

Lamp Test

Check mark

Warning: Care should be exercised during these lamp checks because of the electrical hazards that will be present when the electrical box is open.

Check mark

Safety shutdown devices functional

Check mark

Problem warning lights functional

Check mark

Power On (1LT) lamp lights up when power is applied to the transformer

Check mark

Coolant Filter Lamp (3LT) lights up when power is applied to (3B-12)

Check mark

Air Filter Warning Lamp (4LT) lights up when power is applied to (3B-13)

Check mark

Automatic Restart Lamp (14LT) lights up when power is applied to (3B-8)

Check mark

Sign off on the lamp test

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets