MaintainX Asset Hub logo
EnterprisePricing
Hoshizaki

Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M

Need answers fast?
Explore the manual using AI.

Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M
Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M

Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M

Create an account to install this asset package.

Maintenance Plans for Hoshizaki Stackable Crescent Cuber Model KM-1400SWH3-M

Integrate maintenance plans directly into your work orders in MaintainX.

Marine Model Condenser Maintenance

Check mark

WARNING: Only qualified service technicians should service the appliance.

Check mark

To reduce the risk of electric shock, do not touch the control switch or service switch with damp hands.

Check mark

Before servicing: Move the control switch to the 'OFF' position and turn off the power supply. Place the disconnect in the 'OFF' position. Lockout/Tagout to prevent the power supply from being turned back on inadvertently.

Check mark

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after any maintenance is done to the icemaker. Make sure that none have fallen into the dispenser unit/ice storage bin.

Check mark

Did contaminated seawater enter the system?

Check mark

If contaminated seawater entered the system, flush with clean seawater or fresh water as soon as possible to minimize damage to the condenser.

Check mark

Sign off on the Marine Model Condenser Maintenance

Run this procedureArrow right

1 Yearly Icemaker and Dispenser Unit Cleaning

Check mark

V. Maintenance

Check mark

WARNING: Only qualified service technicians should service the appliance.

Check mark

To reduce the risk of electric shock, do not touch the control switch or service switch with damp hands.

Check mark

Before servicing: Move the control switch to the 'OFF' position and turn off the power supply. Place the disconnect in the 'OFF' position. Lockout/Tagout to prevent the power supply from being turned back on inadvertently.

Check mark

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after any maintenance is done to the icemaker. Make sure that none have fallen into the dispenser unit/ice storage bin.

Check mark

Control switch moved to the 'OFF' position?

Check mark

Power supply turned off?

Check mark

Disconnect placed in the 'OFF' position?

Check mark

Lockout/Tagout performed to prevent the power supply from being turned back on inadvertently?

Run this procedureArrow right

2 Weekly Air Filters Maintenance

Check mark

V. Maintenance

Check mark

More frequent maintenance may be required depending on water quality, the appliance's environment, and local sanitation regulations

Check mark

WARNING

Check mark

Only qualified service technicians should service the appliance.

Check mark

To reduce the risk of electric shock, do not touch the control switch or service switch with damp hands

Check mark

Before servicing: Move the control switch to the \OFF\" position and turn off the power supply. Place the disconnect in the \"OFF\" position. Lockout/Tagout to prevent the power supply from being turned back on inadvertently."

Check mark

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after any maintenance is done to the icemaker. Make sure that none have fallen into the dispenser unit/ice storage bin.

Check mark

Air Filters: Inspect.

Check mark

Wash with warm water and neutral cleaner if dirty every 2 weeks.

Run this procedureArrow right

1 Yearly Condenser Inspection

Check mark

V. Maintenance

Check mark

More frequent maintenance may be required depending on water quality, the appliance's environment, and local sanitation regulations

Check mark

WARNING

Check mark

Only qualified service technicians should service the appliance.

Check mark

To reduce the risk of electric shock, do not touch the control switch or service switch with damp hands

Check mark

Before servicing: Move the control switch to the "OFF" position and turn off the power supply. Place the disconnect in the "OFF" position. Lockout/Tagout to prevent the power supply from being turned back on inadvertently.

Check mark

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after any maintenance is done to the icemaker. Make sure that none have fallen into the dispenser unit/ice storage bin.

Check mark

Condenser:

Check mark

Inspect. Clean if necessary by using a brush or vacuum cleaner. More frequent cleaning may be required depending on location.;

Run this procedureArrow right

1 Daily Scoop Cleaning

Check mark

V. Maintenance

Check mark

More frequent maintenance may be required depending on water quality, the appliance's environment, and local sanitation regulations

Check mark

WARNING

Check mark

Only qualified service technicians should service the appliance.

Check mark

To reduce the risk of electric shock, do not touch the control switch or service switch with damp hands

Check mark

Before servicing: Move the control switch to the 'OFF' position and turn off the power supply. Place the disconnect in the 'OFF' position. Lockout/Tagout to prevent the power supply from being turned back on inadvertently.

Check mark

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after any maintenance is done to the icemaker. Make sure that none have fallen into the dispenser unit/ice storage bin.

Check mark

Is the control switch in the 'OFF' position?

Check mark

Is the power supply turned off?

Run this procedureArrow right

Parts for Hoshizaki Stackable Crescent Cuber KM-1400SWH3-M

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

High Thermal Conductive Type Sealant

4A0683-01

E Control Board

2A1410-02

G Control Board

2A3792-01

High Thermal Conductive Type Sealant

4A0683-01

E Control Board

2A1410-02

G Control Board

2A3792-01

High Thermal Conductive Type Sealant

4A0683-01

E Control Board

2A1410-02

G Control Board

2A3792-01

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Hoshizaki

Explore Other Assets