

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Graco Plural Component Proportioner MD1134
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Equipment Check
This form is to be completed daily to ensure equipment is in good working condition.
Check equipment for any worn or damaged parts.
List any worn or damaged parts found.
Check air purge valve tubing.
Is there any visible solvent accumulation in the air purge valve supply tube?
If solvent is present, describe the amount and location.
Sign here to confirm the completion of the daily equipment check.
1 Monthly Meter Calibration
Warning: Wear eye protection to avoid splashing fluid in the eyes.
Note: The fluid shutoff valves and ratio check valves are retained by mechanical stops that prevent accidental removal of the valve stem while the manifold is pressurized.
Calibrate the meter: The first time the system is operated, whenever new materials are used in the system, at least once per month as part of regular maintenance, whenever a flow meter is serviced or replaced.
Note: K-factors on the Calibration Screen are updated automatically after the calibration procedure is completed.
Note: All values on this screen are in cc, independent of the units set in Configure Screen 1.
Note: The controller will use the active recipe K-factors for meter calibration. The active recipe must be recipe 1 to recipe 60. Recipes 0 and 61 do not have K-factor values.
Before calibrating meter A or B, is the system primed with material?
Are all spray or dispense devices connected to the ProMix shut off?
Are both fluid shutoff valves and sampling valves closed?
Access the parts list for your equipment in MaintainX.
Third Purge Valve Kit
15V354
Solvent Flow Switch Kit
15V536
Power Cable, 100 Ft (30.5 M)
15V213
Fiber Optic Cable, 100 Ft (30.5 M)
15G710
Injection Kit For Dynamic Dosing
15U955
Third Purge Valve Kit
15V354
Solvent Flow Switch Kit
15V536
Power Cable, 100 Ft (30.5 M)
15V213
Fiber Optic Cable, 100 Ft (30.5 M)
15G710
Injection Kit For Dynamic Dosing
15U955
Third Purge Valve Kit
15V354
Solvent Flow Switch Kit
15V536
Power Cable, 100 Ft (30.5 M)
15V213
Fiber Optic Cable, 100 Ft (30.5 M)
15G710
Injection Kit For Dynamic Dosing
15U955
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













