Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump 7SH5G52B3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hourly / 3 Monthly Bearing Lubrication
8. Maintenance
Disconnect and lockout electrical power
Verify bearing location and type
Refer to manufacturer's instructions for lubrication procedure
Enter the hours of use since last lubrication
Has it been 2,000 hours or 3 months since last lubrication?
Select the type of grease used
Fill grease until it comes out of the relief fitting
Mechanical Seal Maintenance
Reassembly
Install the mechanical seal stationary seat in the seal housing using soapy water as a lubricant
Install the mechanical seal spring retainer, spring and rotary assembly on the shaft sleeve using soapy water to lubricate (S-Group)
Slide the shaft sleeve over the pump shaft, ensuring a new shaft sleeve o-ring is used (S-Group)
Verify the correct o-ring is used for the shaft sleeve and impeller washer
Install the mechanical seal spring and rotary on the shaft sleeve using soapy water to lubricate (M-Group)
Slide the shaft sleeve over the pump shaft (M-Group)
Ensure a new shaft sleeve o-ring is used (M-Group)
Place the mechanical seal spring retainer over the impeller hub (M-Group)
Pump Startup Check
7. Operation
Ensure pump is primed and suction pipe is full of liquid
Is the discharge valve partially open?
Check for expansion of piping
Check coupling alignment
Is the pump operating away from zero flow?
Ensure rotating parts are lubricated to prevent scoring or seizing
Wear Ring Maintenance
Disassembly
Remove wear ring if excessively worn
Reassembly
Is the wear ring being replaced?
Ensure no lubricants are used on the metal-to-metal fit when pressing in the replacement
Coupling Alignment Check
3. Alignment
Check the tightness of all hold-down bolts before checking the alignment.
Is re-alignment necessary?
Move the motor if re-alignment is necessary.
Shim as required.
Final alignment is achieved when both parallel and angular requirements are met with both pump and motor hold down bolts tight.
Recheck both alignments after making adjustments.
Enter Total Indicator Reading for parallel alignment.
Is the Total Indicator Reading for parallel alignment .005" or less?
Access the parts list for your equipment in MaintainX.
Mechanical Seal Standard
10K13
Mechanical Seal Standard
10K13
Mechanical Seal Standard
10K13
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX