MaintainX Logo
EnterprisePricing
Gardner Denver

Gardner Denver Compressor EFC99J02E

Need answers fast?
Explore the manual using AI.

Gardner Denver Compressor EFC99J02E
Gardner Denver Compressor EFC99J02E

The Gardner Denver Compressor EFC99J02E is a robust industrial compressor designed for high efficiency and reliability. This model is ideal for various applications, providing consistent performance and durability in demanding environments. Optimize your operations with this trusted OEM compressor solution.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gardner Denver Compressor EFC99J02E

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gardner Denver Compressor EFC99J02E

Gardner Denver Compressor EFC99J02E

Create an account to install this asset package.

Maintenance Plans for Gardner Denver Compressor Model EFC99J02E

Integrate maintenance plans directly into your work orders in MaintainX.

Compressor Sheave Replacement

Check mark

Power supply to the starter disconnected, locked out and tagged out

Check mark

Guards removed

Check mark

Motor base jacked up using adjusting screws to loosen belt tension

Check mark

Belts removed

Check mark

Bolts from tapered bushing removed

Check mark

Sheave pulled off the rotor shaft with a gear puller, if necessary

Check mark

New sheave and tapered bushing installed

Check mark

New belts installed. Belt tension checked and wire guard reattached

Check mark

Sheaves aligned with a straight edge

Run this procedureArrow right

8 Hour Inspection

Check mark

Check the reservoir oil level - add oil if required

Check mark

Observe if the unit loads and unloads properly

Check mark

Check discharge pressure

Check mark

Check discharge temperature

Check mark

Check control panel display for advisory text messages

Run this procedureArrow right

125 Hour Maintenance

Check mark

Check for dirt accumulation on oil/aftercooler core faces and the cooling fan

Check mark

Clean the exterior fin surfaces of the cores by blowing compressed air carrying a nonflammable safety solvent in a direction opposite that of the cooling fan air flow

Check mark

Change the oil filter element every 1000 Hour

Check mark

Change the compressor lubricant AEON 4000

Check mark

Change the compressor lubricant AEON 9000SP

Check mark

Regrease electric motor

Check mark

Sign off on the 125 Hour Maintenance

Run this procedureArrow right

Compressor Belt Replacement

Check mark

Power supply to the starter disconnected, locked out and tagged out

Check mark

Belt guards removed

Check mark

Motor base jacked up using adjusting screws and belt tension loosened

Check mark

Old belts removed

Check mark

New belts installed

Check mark

Belts tightened using the adjust screws and correct belt tension checked

Check mark

Sheave alignment checked

Check mark

Guards assembled

Check mark

Sign off on the compressor belt replacement

Run this procedureArrow right

Air Filter Maintenance

Check mark

Is the unit off and no air pressure in the air/oil reservoir?

Check mark

Is the air service valve located after the compressor package discharge closed?

Check mark

Is the power supply to the starter disconnected, locked out, and tagged out?

Check mark

Is the air filter cover removed?

Check mark

Is the inside of the air filter housing cleaned?

Check mark

Is the new air filter element and the air filter cover installed?

Check mark

Is the air service valve open?

Check mark

Is the element replaced if visual inspection indicates an accumulation of dirt, or a rupture, crack or pin holes in the pleated media?

Check mark

Is the inspection done by placing a bright light inside the element?

Run this procedureArrow right

Parts for Gardner Denver Compressor EFC99J02E

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Conversion Kit

313EFC6005

Belt Tension Gauge

543217

Conversion Kit

313EFC6005

Belt Tension Gauge

543217

Conversion Kit

313EFC6005

Belt Tension Gauge

543217

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gardner Denver

Explore Other Assets