MaintainX Asset Hub logo
EnterprisePricing
FPZ

FPZ Blower SCL K08-TD-15.0

Need answers fast?
Explore the manual using AI.

FPZ Blower SCL K08-TD-15.0
FPZ Blower SCL K08-TD-15.0

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for FPZ Blower SCL K08-TD-15.0

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

FPZ Blower SCL K08-TD-15.0

FPZ Blower SCL K08-TD-15.0

Create an account to install this asset package.

Maintenance Plans for FPZ Blower Model SCL K08-TD-15.0

Integrate maintenance plans directly into your work orders in MaintainX.

10 Daily Filter Replacement

Check mark

Filter Inspection and Cleaning

Check mark

Inspect the cartridge filter for dirt and debris

Check mark

Is the cartridge filter dirty?

Check mark

Clean the cartridge filter if dirty

Check mark

Filter Replacement

Check mark

Is the environment dusty?

Check mark

Replace the cartridge filter if in a dusty environment or if cleaning is insufficient

Check mark

Post Replacement Check

Check mark

Measure the suction resistance after replacement

Run this procedureArrow right

25000 Hourly/4 Yearly Blower Bearing Replacement

Check mark

Pre-replacement checks

Check mark

Verify machine has reached 25,000 working hours or 4 years of operation

Check mark

Is the machine operating under normal working conditions?

Check mark

Bearing replacement

Check mark

Ensure machine is powered off and disconnected from power source

Check mark

Remove the blower housing to access bearings

Check mark

Replace old bearings with new ones

Check mark

Reassemble blower housing

Check mark

Post-replacement verification

Run this procedureArrow right

Blower Sound-Absorbing Replacement

Check mark

Sound-Absorbing Panel Removal

Check mark

Remove #723 flange and #426 O-Ring by removing #908 screws.

Check mark

Remove #906 bolts.

Check mark

Take away the silencers from the unit, being careful not to lose the #424 gaskets.

Check mark

Extract the #720 panels from the silencer housings.

Check mark

Cleaning and Preparation

Check mark

Clean up the #710 retaining screen.

Check mark

If needed, reconstruct #425 seal using Loctite 598 or similar, after cleaning the sealing surfaces of any existing sealant.

Check mark

Reassembly

Run this procedureArrow right

Blower Internal Cleaning

Check mark

CAUTION!

Check mark

Cleaning Instructions for SCL K07-TD / K08-TD

Check mark

Remove screws and cover

Check mark

Remove bearing components

Check mark

Remove impeller and intermediate cover

Check mark

Remove mounting feet and spacers

Check mark

Remove #230 impeller using a puller and #940 key if necessary

Check mark

Clean all components

Check mark

Reassemble components in reverse order

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from FPZ

Explore Other Assets