MaintainX Asset Hub logo
EnterprisePricing
Finish Thompson

Finish Thompson Container Pump Tube BTS-48

Need answers fast?
Explore the manual using AI.

Finish Thompson Container Pump Tube BTS-48
Finish Thompson Container Pump Tube BTS-48

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Finish Thompson Container Pump Tube BTS-48

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Finish Thompson Container Pump Tube BTS-48

Finish Thompson Container Pump Tube BTS-48

Create an account to install this asset package.

Maintenance Plans for Finish Thompson Container Pump Tube Model BTS-48

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Disassembly

Check mark

Disassembly

Check mark

Loosen the setscrew and remove the half coupling (item 2) from the end of the pump shaft.

Check mark

Gently hold the intake tube and use a 3/8” punch and hammer to drive the bottom of the shaft (item 11) toward the top until the bearing assembly (item 3) is exposed.

Check mark

Use a 1/8” punch to drive out the roll pin in the center of the bearing assembly (item 3) and slide the bearing assembly off of the shaft.

Check mark

Remove the pump shaft assembly by pushing it down through the intake tube (item 7) and out the bottom.

Check mark

Remove and discard the seal assembly (item 4). Never re-use a seal assembly.

Check mark

Post Disassembly Check

Check mark

Ensure all parts are removed and accounted for

Check mark

Is the work area clean and free of debris?

Run this procedureArrow right

Pump Inspection

Check mark

Visual Inspection

Check mark

Inspect components for damage

Check mark

Replace any damaged components

Check mark

Bearing Assembly Inspection

Check mark

Inspect bearing assembly for issues

Check mark

Replace bearing assembly if issues are found

Check mark

Pump Shaft Inspection

Check mark

Inspect pump shaft for excessive wear

Check mark

Replace pump shaft if excessive wear is found

Run this procedureArrow right

Pump Assembly

Check mark

Shaft and Seal Preparation

Check mark

Insert the shaft assembly up through the bottom of the tube until it sticks out the top of the pump head.

Check mark

Warm up the seal assembly (item 4) using a heat lamp or soaking them in hot water.

Check mark

Ensure there are no metal burrs on the pump shaft in the bearing hole location or the coupling half setscrew location.

Check mark

Seal Installation

Check mark

Lubricate the end of the shaft with Vaseline.

Check mark

Install the seal down over the shaft with the two “slots” facing up toward the bearing assembly.

Check mark

Ensure the raised lip in the center of the seal goes on straight and does not buckle on one side.

Check mark

Bearing Assembly Installation

Run this procedureArrow right

Parts for Finish Thompson Container Pump Tube BTS-48

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Coupling Insert

J100014

Coupling Half

J100013

Bearing Assembly With Roll Pin

A101672

Seal Assembly PTFE

A100284

Lock Washer #8 Brass

J100823

Coupling Insert

J100014

Coupling Half

J100013

Bearing Assembly With Roll Pin

A101672

Seal Assembly PTFE

A100284

Lock Washer #8 Brass

J100823

Coupling Insert

J100014

Coupling Half

J100013

Bearing Assembly With Roll Pin

A101672

Seal Assembly PTFE

A100284

Lock Washer #8 Brass

J100823

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Finish Thompson

Explore Other Assets