

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Ergoline Vertical Stand-Up Tanning Booth Sunrise 480
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Surface Cleaning
Acrylic Panel Cleaning
Inspect acrylic panels for fingerprints and soiling
Remove fingerprints and other soiling carefully
Ensure no dry cloth is used to avoid scratching
Confirm no concentrated disinfectants or solvents are used
Plastic Surfaces Cleaning
Use warm water and soft chamois leather for cleaning
Ensure no aggressive cleaning agents are used
Remove rings, watches, bracelets before cleaning
AQUA System Canister Replacement
Safety Precautions
Ensure the canister is genuine and not filled with tap water or other liquids.
Verify that no liquid from the old canister is added to the new canister.
Confirm the maximum temperature for transport and storage is not exceeded.
Check the expiration date on the canister.
Changing the AROMA Canister
Remove the cover.
Remove the AROMA canister.
Unscrew the lid on the new canister.
300 Hourly AROMA Canister Replacement
Safety Precautions
Ensure the AQUA SYSTEM canister is not filled with tap water or other liquids.
Verify that only a genuine AQUA SYSTEM canister is used for replacement.
Do not add any remaining liquid from the old canister to the new canister.
Ensure the maximum temperature specified is not exceeded during transport and storage.
Check the expiration date on the canister.
Changing the AROMA Canister
Remove the cover.
Remove the AROMA canister.
1000 Hourly UV Lamp Maintenance
Cleaning or Replacing UV Lamps in the Door
Remove fingerprints and other soiling carefully
Remove the screws and remove door handle
Remove the screws and remove the acrylic panel
Loosen screws 3-4 mm and take off the upper lamp cover
Replacing Lamps
Ensure lamps and metal parts have cooled down sufficiently before replacing
Disconnect the device from the mains power immediately if bulb/lamp glass breaks
Ventilate the room for at least 15 minutes
1000 Hourly Starter Ambient Light Maintenance
Disassembly
Remove the screws
Remove the lamp cover
Replacement
Refer to page 58 for replacing lamps
Refer to page 59 for replacing starters
Reassembly
Reassemble the parts in reverse order
Access the parts list for your equipment in MaintainX.
Jack Plug
4630911001
Jack Plug
4630911001
Jack Plug
4630911001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













