Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Eaton Distribution Panel PRL4B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Year Cleaning
Warning: Ensure the switchboard is de-energized before starting the cleaning process
Switchboard de-energized?
Upload a photo of the switchboard before cleaning
Dust and debris removed from bus bars, connections, supports, and enclosure surfaces?
Switchboard wiped clean with a lint-free cloth?
Was solvent used in cleaning?
Warning: Do not use solvents to clean equipment, as damage to surfaces can occur
Was compressed air used in cleaning?
Warning: Do not use compressed air in cleaning. It can imbed contaminants within overcurrent devices, metering equipment, and other components
Ventilation Maintenance
Check all grills and ventilation ports for obstructions and accumulations of dirt
Clean ventilation ports, if necessary
For switchboards installed outdoors, inspect the air space under the switchboard to be sure that it is clean and clear of debris, leaves, and obstructions
Sign off on the ventilation maintenance
Circuit Breaker Inspection
Visual inspection for signs of discoloration, cracking, scorching, overheating, or broken parts
Exercise the breaker operating mechanism, making sure it is opening and closing
Breaker showing signs of any one of these issues
If any of the above checks fail, the breaker should be replaced
Fusible Overcurrent Device Inspection
Visually inspect the switching mechanism and fuse connections
Visually inspect the fusible devices for signs of discoloration, cracking, scorching, overheating, or broken parts
Replace any worn parts or the entire switch
Sign off on the inspection
Secondary Wiring Check
- Check all wiring connections for tightness, including those at the current and potential transformers, if present, and at all terminal blocks
- Check all secondary wiring connections to ensure that they are properly connected to the switchboard ground bus, where indicated
- Look for broken wire strands and pinched or damaged insulation;
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX