The Eaton Distribution Panel PRL2A is a robust electrical distribution solution designed for efficient power management in industrial settings. This panel ensures reliable operation and safety, making it ideal for various applications requiring dependable electrical distribution.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Eaton Eaton Distribution Panel PRL2A PRL2A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Ventilation Maintenance
Check all grills and ventilation ports for obstructions and accumulations of dirt
Clean ventilation ports, if necessary
For switchboards installed outdoors, inspect the air space under the switchboard to be sure that it is clean and clear of debris, leaves, and obstructions
Sign off on the ventilation maintenance
Bus and Cable Connection Inspection
Inspect bus bar and cables for visible damage
Visually inspect connections for overheating and damage
All bus bar and cable connections checked and torqued in accordance with labeling on the switchboard
Inspect for broken wire strands and pinched or damaged insulation on cable connections
Sign off on the inspection
Insulation Maintenance
Warning: This maintenance check requires trained personnel with PPE!
Visual check for damage on bus bar and structure insulation
List of damaged parts
Upload a photo of the damaged parts
Insulation material dry and clean
Sign off on the insulation maintenance
Secondary Wiring Check
- Check all wiring connections for tightness, including those at the current and potential transformers, if present, and at all terminal blocks
- Check all secondary wiring connections to ensure that they are properly connected to the switchboard ground bus, where indicated
- Look for broken wire strands and pinched or damaged insulation;
Fuse Replacement
Switch mechanism is turned to the OFF position
Visual inspection of the switch contacts, blades, and mechanism to ensure that the mechanism is in the OPEN/OFF position
Fuses are of the proper class, ampere, voltage, and interrupting rating
Non–current-limiting fuses are not used as replacements for current-limiting fuses
Rejection mechanisms that are provided to prevent the installation of the incorrect class of fuse are not defeated
Sign off on the fuse replacement
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX