Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Eaton Uninterruptible Power System 93PM-60+60(120)
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Day Inspection
Area surrounding the UPS system is not cluttered, allowing free access to the unit
Air intakes (vents on the front door of the UPS cabinet) and the exhaust openings (at the rear of the UPS cabinet) are not blocked
UPS is in the normal mode (the normal mode status indicator is illuminated)
Is an alarm lamp lit or the normal mode status indicator not lit?
If an alarm lamp is lit or the normal mode status indicator is not lit, contact an Eaton service representative
Sign off on the 1 Day Inspection
Periodic Maintenance
Inspect the UPS for evidence of overheating
Inspect components, wiring, and connections for evidence of overheating
Inspect bolted connections for evidence of overheating
Re-torque bolted connections periodically
1 Month Maintenance
Examine the system parameters on the control panel
If the optional air filters are installed, examine them (located behind the front doors)
Wash or replace the air filters
Open the UPS front door
Replace the filters
Close the UPS front door
Record the check results and any corrective actions in a service log
Preventive should be performed only by authorized service personnel familiar with maintenance and servicing of the UPS system every 1 Year
Authorized service personnel signature
Access the parts list for your equipment in MaintainX.
Control Panel
-
Door Latch
-
Communications Area
-
UPM
-
Rectifier Input Switch
-
Control Panel
-
Door Latch
-
Communications Area
-
UPM
-
Rectifier Input Switch
-
Control Panel
-
Door Latch
-
Communications Area
-
UPM
-
Rectifier Input Switch
-
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX