

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Dunham-Bush Rotary Screw Water Chiller WCFX22
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Oil Replacement
Pre-replacement Checks
Check the current oil level in the compressor
Is the oil return visible in the compressor?
Oil Replacement Process
Shut down the compressor
Drain the old oil from the compressor
Refill the compressor with new oil
Post-replacement Checks
Is the oil level within the recommended range after replacement?
Head Gasket Inspection
Visual Inspection
Inspect the head gasket for physical disfigurement
Check the gasket for signs of deterioration
Decision Making
Does the gasket need renewal based on inspection results?
Post Inspection
Document the inspection results
Inspector's signature
Electrical Malfunction Inspection
Phase Control Relay Inspection
Has the phase control relay tripped?
Did the phase control relay trip again after resetting?
Call your electric utility to investigate the problem if the relay trips again after resetting.
Circuit Breaker and Motor Overload Relay Inspection
Has the circuit breaker or motor overload relay tripped?
Do not reset and try to run the compressor again if the circuit breaker or motor overload relay trips.
Refrigerant Charging
Initial Inspection
Check flash economizer feed line sightglass for bubbles
Refrigerant Charging Process
Connect refrigerant cylinder to charging valve on evaporator feed line
Monitor refrigerant level until condenser drain sight glass is clear
Final Verification
Ensure sight glass is clear at all operating conditions
1 Yearly Vessels Water Side Cleaning
Performance Data Recording
Record full load performance data on the log sheet
Approach Temperature Check
Enter the current approach temperature for the evaporator
Enter the current approach temperature for the condenser
Is the approach temperature more than 2°F above the clean condition?
Chemical Cleaning
Have water treatment specialists recommended chemicals for cleaning?
Rinse the system thoroughly after chemical cleaning
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













