MaintainX Asset Hub logo
EnterprisePricing
Dunham-Bush

Dunham-Bush Rotary Screw Water Chiller WCFX12

Need answers fast?
Explore the manual using AI.

Dunham-Bush Rotary Screw Water Chiller WCFX12
Dunham-Bush Rotary Screw Water Chiller WCFX12

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Dunham-Bush Rotary Screw Water Chiller WCFX12

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Dunham-Bush Rotary Screw Water Chiller WCFX12

Dunham-Bush Rotary Screw Water Chiller WCFX12

Create an account to install this asset package.

Maintenance Plans for Dunham-Bush Rotary Screw Water Chiller Model WCFX12

Integrate maintenance plans directly into your work orders in MaintainX.

Refrigerant Charging

Check mark

Initial Inspection

Check mark

Check flash economizer feed line sightglass for bubbles

Check mark

Refrigerant Charging Process

Check mark

Connect refrigerant cylinder to charging valve on evaporator feed line

Check mark

Monitor refrigerant level until condenser drain sight glass is clear

Check mark

Final Verification

Check mark

Ensure sight glass is clear at all operating conditions

Run this procedureArrow right

1 Monthly Chiller Inspection

Check mark

Check water treatment system

Check mark

Wipe down external surfaces of unit

Check mark

Control Panel Inspection

Check mark

Shut unit down

Check mark

Open main disconnect

Check mark

Inspect control panel for loose wires

Check mark

Inspect control panel for burned contacts

Check mark

Inspect control panel for signs of overheated wires

Check mark

Unit Restart and Performance Check

Run this procedureArrow right

1 Yearly Oil Replacement

Check mark

Pre-replacement checks

Check mark

Check compressor oil level

Check mark

Is the oil level within the normal range?

Check mark

Oil replacement process

Check mark

Drain old oil from the compressor

Check mark

Replace with new oil

Check mark

Post-replacement checks

Check mark

Check for oil leaks

Check mark

Ensure compressor shows oil return

Run this procedureArrow right

Electrical Malfunction Inspection

Check mark

Phase Control Relay Inspection

Check mark

Has the phase control relay tripped?

Check mark

Did the phase control relay trip again after resetting?

Check mark

Call your electric utility to investigate the problem

Check mark

Circuit Breaker and Motor Overload Relay Inspection

Check mark

Has the circuit breaker or motor overload relay tripped?

Check mark

Do not reset and try to run the compressor again

Run this procedureArrow right

1 Yearly Vessels Water Side Cleaning

Check mark

Record full load performance data on the log sheet

Check mark

Check if the approach for either vessel increases by more than 2°F above the approach recorded at clean conditions

Check mark

Clean the waterside surfaces

Check mark

Rinse the system thoroughly after cleaning to remove chemicals

Check mark

Drain the water from the vessel tubes

Check mark

Remove the headers from the vessel tubes

Check mark

Brush each tube individually with a tube cleaning brush

Check mark

Replace the headers, ensuring proper gasket positioning

Check mark

Refill the system with water

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Dunham-Bush

Explore Other Assets