MaintainX, an Autodesk company
EnterprisePricing
Doosan

Doosan Compressor XHP1000WCAT-T4i

Need answers fast?
Explore the manual using AI.

Doosan Compressor XHP1000WCAT-T4i
Doosan Compressor XHP1000WCAT-T4i

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Compressor XHP1000WCAT-T4i

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Compressor XHP1000WCAT-T4i

Doosan Compressor XHP1000WCAT-T4i

Create an account to install this asset package.

Maintenance Plans for Doosan Compressor Model XHP1000WCAT-T4i

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly/6 Monthly Compressor Maintenance

Check mark

Compressor Oil Filter Element replaced

Check mark

Compressor Oil replaced

Check mark

Wheels (bearings, seals, etc) checked

Check mark

Engine Coolant checked

Check mark

Fuel Tank (fill at end of day) drained

Check mark

Hydraulic Oil Level replaced

Check mark

Sign off on the compressor maintenance

Run this procedureArrow right

12 Monthly Fresh Mixture Replenish

Check mark

WARNING: Do not remove the cap from a HOT engine radiator. The sudden release of pressure from a heated cooling system can result in serious personal injury.

Check mark

The engine cooling system is filled at the factory with a 50/50 mixture of water and ethylene glycol. This permanent type antifreeze contains rust inhibitors and provides protection to --35° F (--37°C).

Check mark

The use of such a mixture is recommended for both summer and winter operation. When using water alone, be sure to add a reputable brand of rust inhibitor to prevent internal corrosion.

Check mark

It is recommended to test the freezing protection of the coolant every six months or prior to freezing temperatures. Replenish with a fresh mixture every twelve months. A drain for the system is located in the bottom radiator tank. An alternate method would be to disconnect a bottom radiator hose.

Check mark

Is the engine cool?

Check mark

Is the coolant mixture 50/50 water and ethylene glycol?

Check mark

Is the rust inhibitor added if using water alone?

Check mark

Is the freezing protection of the coolant tested every six months or prior to freezing temperatures?

Check mark

Is the coolant replenished with a fresh mixture every twelve months?

Run this procedureArrow right

1 Daily Compressor Maintenance

Check mark

Engine Oil Level Check

Check mark

Radiator Coolant Level Check

Check mark

Air Cleaner Service Indicators Check

Check mark

Fuel Tank (fill at end of day)

Check mark

Fuel/Water Separator Check

Check mark

Lights (running, brake, & turn) check before towing

Check mark

Pintle Eye Bolts check before towing

Check mark

Sign off on the daily compressor maintenance

Run this procedureArrow right

1 Monthly/500 Miles Running Gear Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Enter the current mileage of the vehicle

Check mark

Wheel lug nuts tightened to 85 - 95 lbs.-ft.?

Check mark

Every six months, perform the following checks

Check mark

Wheel bearings inspected for damage or excessive wear?

Check mark

Grease seals inspected for damage or excessive wear?

Check mark

Axle spindles inspected for damage or excessive wear?

Check mark

Repack wheel bearings using a wheel bearing grease conforming to specification MIL--G--10924

Check mark

Bearing completely filled with grease?

Run this procedureArrow right

1 Monthly Compressor Oil Cooler Maintenance

Check mark

Warning: Ensure the compressor is turned off and cooled down before starting the maintenance.

Check mark

Check for grease, oil and dirt accumulation on the exterior surfaces of the oil cooler.

Check mark

Upload a photo of the oil cooler before cleaning.

Check mark

Cleaning Procedure

Check mark

Direct compressed air containing a nonflammable safety solvent through the core of the oil cooler.

Check mark

Upload a photo of the oil cooler after cleaning.

Check mark

Check for foreign deposits, such as sludge and lacquer, in the oil cooler.

Check mark

If foreign deposits are found:

Check mark

Clean the oil cooler using a cleaning compound in accordance with the manufacturer’s recommendations.

Run this procedureArrow right

Parts for Doosan Compressor XHP1000WCAT-T4i

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Electric Brake Kit

36088799

Electric Brake Kit

36088799

Electric Brake Kit

36088799

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets