

The Daikin Packaged Rooftop System DPS020AHMG4DV-4 is a high-efficiency HVAC solution designed for commercial applications. This rooftop unit combines advanced technology with reliable performance, ensuring optimal climate control and energy savings for your facility.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Packaged Rooftop System DPS020AHMG4DV-4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Coated Coil Cleaning
Clean Option E Coated Coils
WARNING: Prior to cleaning the unit, turn off and lock out the main power switch to the unit and open all access panels
The following cleaning procedures are recommended as part of the routine maintenance activities for Option E Coated Coils. Documented routine cleaning of Option E Coated Coils is required to maintain warranty coverage.
1. Remove Surface Loaded Fibers: Surface loaded fibers or dirt should be removed prior to water rinse to prevent further restriction of airflow.
If unable to back wash the side of the coil opposite that of the coils entering air side, then surface loaded fibers or dirt should be removed with:
NOTE: Use of a water stream, such as a garden hose, against a surface loaded coil will drive the fibers and dirt into the coil. This will make cleaning efforts more difficult. Surface loaded fibers must be completely removed prior to using low velocity clean water rinse.
3. Periodic Clean Water Rinse: A monthly clean water rinse is recommended for coils that are applied in coastal or industrial environments to help to remove chlorides, dirt and debris. An elevated water temperature (not to exceed 130°F) will reduce surface tension, increasing the ability to remove chlorides and dirt. Pressure washer PSI must not exceed 900 psig and the nozzle should remain at least 1 foot from the coil to avoid damaging fin edges.
Enter the water temperature used for cleaning
Enter the PSI of the pressure washer used for cleaning
1 Monthly Rooftop System Maintenance
Check cabinet air filters and replace if dirty
After heavy snowfall verify that combustion air intakes are not blocked by snow
Periodically check during periods of snow accumulation as drifting may also lead to combustion air intake blockage
Open a door on each section and verify that no moisture or debris is accumulating in the unit monthly during preparation for storage (p.137);
1 Yearly Rooftop System Maintenance
Check vent terminal screens for blockages and accumulation
Heater and the Venting System shall be inspected once a year by a qualified service agency.
Check all valves, piping and connections of Gas Train for leakage with a rich soap solution or UL 913 combustible gas leak detector. Any bubbling is considered a leak and must be eliminated.
Inspect and clean flame rod, ignition electrode, and burner manifold
Remove any debris that may have accumulated in the drain pain and drain
Sign off on the rooftop system maintenance
2 Weekly Rooftop System Maintenance
Prepare for storage control compartment
Is the electronic control equipment in the unit stored in a 5% to 95% RH (non-condensing) environment?
It may be necessary to put a heat source (light bulb) in the main control panel to prevent the accumulation of atmospheric condensate within the panel. The location and wattage of the heat source is dependent on local environmental conditions
Is the heat source in the main control panel functional?
Is the heat source adequate for current conditions?
Check the control compartment every two weeks to confirm that the heat source is functional and is adequate for current conditions
Sign off on the 2 Weekly Rooftop System Maintenance
3 Monthly Coated Coil Cleaning
Clean Option E Coated Coils Surfaces
Quarterly cleaning is essential to extend the life of an Option E Coated Coil and is required to maintain warranty coverage
Coil cleaning shall be part of the unit's regularly scheduled maintenance procedures
Failure to clean an Option E Coated Coil will void the warranty and may result in reduced efficiency and durability in the environment
For routine quarterly cleaning, first clean the coil with the below approved coil cleaner
After cleaning the coils with the approved cleaning agent, use the approved chloride remover (under the Recommended Chloride Remover section) to remove soluble salts and revitalize the unit
Sign off on the coil cleaning
Access the parts list for your equipment in MaintainX.
Chloride Remover
Chlor*Rid DTS
Enviro-Coil Concentrate
H-EC01
Furnace Control
VB1200
Gas Safety Control Valve
VR8305Q
LP Gas Furnace
910191274
Chloride Remover
Chlor*Rid DTS
Enviro-Coil Concentrate
H-EC01
Furnace Control
VB1200
Gas Safety Control Valve
VR8305Q
LP Gas Furnace
910191274
Chloride Remover
Chlor*Rid DTS
Enviro-Coil Concentrate
H-EC01
Furnace Control
VB1200
Gas Safety Control Valve
VR8305Q
LP Gas Furnace
910191274
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













