The Daikin Indoor Cooling/Heating Unit FXUQ24PVJU is a versatile HVAC solution designed for efficient climate control in residential and commercial spaces. This unit offers reliable heating and cooling performance, ensuring comfort throughout the year while maintaining energy efficiency.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Indoor Cooling/Heating Unit FXUQ24PVJU

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Indoor Cooling/Heating Unit FXUQ24PVJU

Daikin Indoor Cooling/Heating Unit FXUQ24PVJU

Create an account to install this asset package.

Maintenance Plans for Daikin Indoor Cooling/Heating Unit Model FXUQ24PVJU

Integrate maintenance plans directly into your work orders in MaintainX.

Electronic Expansion Valve Coil Check

Check mark

Remove the connector for electronic expansion valve (X7A) from PCB

Check mark

Measure the resistance value between White and Yellow pins

Check mark

No continuity between White and Yellow

Check mark

Measure the resistance value between White and Orange pins

Check mark

Resistance value between White and Orange is approx. 300 Ω

Check mark

Measure the resistance value between White and Red pins

Check mark

Resistance value between White and Red is approx. 150 Ω

Check mark

Measure the resistance value between Yellow and Blue pins

Check mark

Resistance value between Yellow and Blue is approx. 300 Ω

Run this procedureArrow right

Heat Recovery System Maintenance

Check mark

Check for High Pressure in cooling, is the outdoor unit electronic expansion valve (main) fully open?

Check mark

Check for High Pressure in heating, is the indoor unit electronic expansion valve used for “subcooled degree control”?

Check mark

Check Thermistor

Check mark

Check Pressure Sensor

Check mark

Check for broken wire of the relay wire

Check mark

Procedure for checking outdoor-outdoor unit transmission wiring for broken wires: Is there continuity between the transmission wiring terminal blocks F1 and F2 of the central remote controller?

Check mark

Procedure for checking indoor-outdoor unit transmission wiring for broken wires: Is there continuity between the transmission wirings F1 and F2 of the 'Indoor Unit a' that is farthest from the 'Outdoor Unit C'?

Check mark

Check Fan Motor Connector (Power Supply Cable): Is the resistance between phases of U, V, W at the motor side connectors balanced and there is no short circuiting?

Check mark

Check Fan Motor Connector (Signal Cable): Is the resistance between Vcc and each phase of U, V, W, and GND and each phase at the motor side connectors balanced within the range of ± 20 %?

Run this procedureArrow right

Heat Recovery System Vacuuming/Dehydration Maintenance

Check mark

Choose the type of vacuuming and dehydration

Check mark

Vacuum pump connected to service ports of liquid pipe and gas pipe

Check mark

Enter the vacuum level achieved after 2 hours of vacuuming

Check mark

Did the vacuum level reach –100.7 kPa (–14.6 psi) or less after 2 hours?

Check mark

Enter the vacuum level achieved after additional 1 hour of vacuuming (if required)

Check mark

Did the vacuum level reach –100.7 kPa (–14.6 psi) or less after 3 hours?

Check mark

Leak tests conducted (if required)

Check mark

Compressor left at the degree of vacuum of –100.7 kPa (–14.6 psi) or less for a period of 1 hour or more

Check mark

Did the vacuum gauge reading rise after 1 hour?

Run this procedureArrow right

Power Transistor Check

Check mark

Power OFF

Check mark

All wiring removed from the PCB where power transistors are mounted

Check mark

Type of multimeter prepared

Check mark

Power supply turned OFF and 10 minutes or more have passed

Check mark

Measurement of resistance made

Check mark

Measurement mode for analog multimeter

Check mark

Measurement in diode check mode for digital multimeter

Run this procedureArrow right

Pressure Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Compressor PI control in cooling

Check mark

Low pressure protection control

Check mark

Hot gas bypass control

Check mark

Superheated degree control in cooling

Check mark

Superheated degree control in heating

Check mark

Enter the low pressure reading

Check mark

Enter the high pressure reading

Check mark

Sign off on the pressure check

Run this procedureArrow right

Parts for Daikin Indoor Cooling/Heating Unit FXUQ24PVJU

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Junction Pipe Kit

KHRP26A250T

Junction Pipe Kit

KHRP26A250T

Junction Pipe Kit

KHRP26A250T

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets