MaintainX Logo
EnterprisePricing
Daikin

Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO

Need answers fast?
Explore the manual using AI.

Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO
Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO

The Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO is a high-efficiency HVAC solution designed for commercial applications. This reliable rooftop unit offers advanced features for optimal climate control and energy savings, ensuring comfort and performance in various environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO

Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO

Create an account to install this asset package.

Maintenance Plans for Daikin Packaged Rooftop System Model DPSA035A4BHCME0B02560CGG1LOVOO

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Cabinet Maintenance

Check mark

Open a door on each section

Check mark

Verify that no moisture is accumulating in the unit

Check mark

Verify that no debris is accumulating in the unit

Run this procedureArrow right

1 Monthly Heating System Maintenance

Check mark

Check cabinet air filters and replace if dirty

Check mark

After heavy snowfall verify that combustion air intakes are not blocked by snow

Check mark

Periodically check during periods of snow accumulation as drifting may also lead to combustion air intake blockage

Run this procedureArrow right

9000 Hours / 1 Yearly Rooftop System Maintenance

Check mark

UV Light Bulbs Replacement

Check mark

Disconnect power to unit and UV lamps

Check mark

Disconnect power harness at the base of the sheet metal rack holding the UV lamps

Check mark

Disconnect metal conduit power harness connected to the UV lamp

Check mark

Remove lamps from the right side of the unit

Check mark

Remove the 61\ bulbs by unscrewing the 4 fasteners at the top and bottom corners of the sheet metal rack

Check mark

Install new bulbs and connect to a power harness, slide the rack back into the unit and reinstall the 4 mounting screws on the corners. Reconnect the power harness at the bottom right corner of the rack

Check mark

PCO Panels Cleaning

Check mark

Wash PCO panels with low pressure water and leave to air dry

Run this procedureArrow right

1 Yearly Air Filters Maintenance

Check mark

Check vent terminal screens for blockages and accumulation

Check mark

Heater and the Venting System: Shall be inspected once a year by a qualified service agency

Check mark

Gas Train: Check all valves, piping and connections for leakage with a rich soap solution or UL 913 combustible gas leak detector. Any bubbling is considered a leak and must be eliminated.

Check mark

Inspect and clean flame rod, ignition electrode, and burner manifold

Check mark

Condensate Pan and Drain: Remove any debris that may have accumulated in the drain pain and drain

Check mark

Special Weather Events

Check mark

After heavy snowfall, verify that combustion air intakes are not blocked by snow

Check mark

Periodically check during periods of snow accumulation as drifting may also lead to combustion air intake blockage

Check mark

Sign off on the air filters maintenance

Run this procedureArrow right

Rooftop System Maintenance

Check mark

Installation and maintenance must be performed only by qualified personnel who are trained and experienced with this type of equipment and familiar with local codes and regulations

Check mark

LOCKOUT/TAGOUT all power sources prior to servicing the equipment

Check mark

Hot surface hazard. May cause minor to moderate personal injury. Allow burner assembly and chimney flues to cool before servicing equipment

Check mark

Prevent snow levels from blocking airflow into the furnace vestibule and combustion air inlet. Ensure snow does not accumulate and interfere with the operation of electronics within the vestibule

Check mark

Routine maintenance should cover the following items:

Check mark

Unit Storage (Location): The Rebel is an outdoor unit. However, the construction schedule may dictate storage either on the ground or in its final position at the site.

Check mark

If the unit is stored on the ground, additional precautions should be taken as follows:

Check mark

Preparation for Storage: Supply (and Return) Fans

Check mark

Turn the supply and return fan manual motor protectors (MMP) to the OFF position

Run this procedureArrow right

Parts for Daikin Packaged Rooftop System DPSA035A4BHCME0B02560CGG1LOVOO

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Leg Extension

910111494

Holding Frame

910111491

Natural Gas Furnace

404229302

Holding Frame

910111674

Prefilter Holding Frame

910123166

Leg Extension

910111494

Holding Frame

910111491

Natural Gas Furnace

404229302

Holding Frame

910111674

Prefilter Holding Frame

910123166

Leg Extension

910111494

Holding Frame

910111491

Natural Gas Furnace

404229302

Holding Frame

910111674

Prefilter Holding Frame

910123166

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets